ML19259A966

From kanterella
Jump to navigation Jump to search
Forwards LER 78-020/03L-0 & 78-023-03L-0
Date released: 09/30/2019 Download: ML19259A966


LER 78-023/03L-0 on 781206:control Element Assemblies (CEA) 26,1,48,46,57 & 52 Dropped;Cea'S 22,27 & 29 Slipped.Cea'S 26,1,48,46,57,22 & 52 Dropped or Slipped Due to Timer Card Failures;Others Failed Due to Sequencer Card Failures
ML19259A972
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/05/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19259A972 (1)
LER 78-020/03L-0 on 781206:control Element Assembly Calculator 2 Declared Inoperable Due to Oscillating Reed Switch Position Transmitter Power Supply.Caused by Power Supply Failure
ML19259A970
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/05/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19259A970 (1)
Forwards LER 78-020/03L-0 & 78-023-03L-0
ML19259A965
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/05/1979
From: David Williams
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19259A965 (1)