Responds to NRC Re Violations Noted in Insp Rept 50-062/78-02.Corrective Actions:Response & Leak Tests of Pocket Dosimeters Will Be Done at Maximum Intervals of 6 Months
ML19259A679
Person / Time
Site: University of Virginia
Issue date: 12/19/1978
From: Williamson T
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19259A678 List:
References
NUDOCS 7901100071
Download: ML19259A679 (1)


Text

..

(w,/O g UNIVERSITY OF VIRGtNIA s

SCHOOL OF ENGINEERING ANO %PPLIED SCIENCE V-Vv i

CH AR LOTTESVI LLE. 22901 DEP A RTM ENT OF NUCLEAR ENGINEERING AND ENGIN EE.RI N G PHYSICS T ELE P HON E:

804 924-713 REACTOR FACILITY December 19, IC78 Mr. James P. O'Reilly, Director U. S, Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30303 Re:

License R-66 Docket 50-62 Gentlemen:

This letter provides our response to a possible deviation from generally accepted industry practice which was identified as Item A, Appendix A in your 1ctter RII:SCE 50-62/78-2 dated November 28, 1978.

This respcnse was inadvertently omitted from our letter of December 14, 1978.

Appendix A, Item A stated that response and leak tests of pocket dosimeters had not been performed every six months in accordance with Regulatory Guide S.4, " Direct-Reading and Indirect-Reading Pocket Dosimeters."

Since the NRC inspection, procedures for response and leak tests of pocket dosimeters have been written.

The Reactor llealth Physicist has been directed to perform response and leak tests according to these procedures at maximum intervals of six months.

Records of these tests will be maintained.

All pocket dosimeters at the Reactor Facility have received a response and Icak test.

n ose tests verified that the dosimeters have acceptable performance.

These corrective actions were completed by December 7, 1978.

Sincerely,

-, i f ) - }r, \\jfwf

)D 1 ggg g

T. G. Williamson, Director Reactor Facility TGi/1t ec:

Mr. Steve Ramos

,cc:,J. P. Farrar Operating Reactors Branch O,d A. R. Reynolds Div. of Reactor Licensing

11. W. Berk U. S. N. R. C.

B.

L. Shriver Washington, D. C. 20555

'~M 009