ML19257D641
| ML19257D641 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/03/1980 |
| From: | Olson R BALTIMORE GAS & ELECTRIC CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-79-06C, IEB-79-6C, NUDOCS 8002050227 | |
| Download: ML19257D641 (1) | |
Text
YN-B A LTIMORE GAS AND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ELECTRIC ENGINEERING January 3, 1980 DEPARTMENT Mr. Boyce H. Grier, Director Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19h06
Subject:
Calvert Cliffs Nuclear Power Plant Docket Nos. 50-317 and 50-318 IE Bulletin 79-0$C
Reference:
(a) Letter from Mr. G. E. Liebler to Dr. D. F.
Ross, Jr. dated 10/31/79, Inadequate Core cooling.
Dear Mr. Grier:
Reference (a) submitted to NRC CEN-ll7 " Response to NRC IE Bulletin 79-06C, Item 5".
That report was submitted on behalf of the Post-TMI Combustion Engineering NSSS Owners Group and for record purposes, is included on the Calvert Cliffs dockets by reference.
Verytrulykch I
/
ve~
/.
R. C. L. Olson Senior Engineer RCLO/smn ec: Office of Inspection & Enforcement U. S. Nuclear Regulatory Ccanission Washington, D. C.
20555 Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Cornission Washington, D. C.
20555 G. F. Trowbridge, Esquire J. A. Biddison, Esquire Mr. E. L. Conner, Jr.
1871 346 g
coccos o zz7