ML19257D554

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Reactor Auxiliary Bldg Reduced Floor Load.Caused by Cut Rebar.Final Rept Will Be Forwarded by 800523
ML19257D554
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/23/1980
From: Fahrner W
DETROIT EDISON CO.
To:
References
EF2-47-354, NUDOCS 8002040597
Download: ML19257D554 (1)


Text

C6fiCI.[

_CISOn Jarua / 23, 1980 EF2

_,354 Mr.

wes C. Keppler, Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Suoject:

hterin Report of 10CFR50.55(e} Item an Reactor Auxiliary Building Re-duced Floce Load.

Dear Mr. Keppler:

On Decenber 27, 1979, Detroit Edison's Mr. L. A. Walker, Site Project Puality Assurance Engineer, telephoned Mr. F.J. Jacionski o' NRC Region III to report on a reduced floor load in the Reactor Auxiliary BuildPig at the Femi 2 Site.

The problem results from cut rebar.

So far, it has been decermined that 12 slabs are affected. Detroit Edison Engineering is presently analyzing the severity of the problem. A final report will be submitte,d to jou by May *23, 1980.

If you have any questions on this ratter, please contact our EF2 Site Project Quality Assurance Engineer.

Sincerely,

.Yhki kL%

s.

~

W.J. fahrner Project Manager Enrico Fermi 2 cc:

Mr. John G. Davis, Acting Director Office of Inspection and Enforcerrent Division of Reactor :nspection Comission U.S. Nuclear Regulatory Comission gl 0

Washington D.C.

20555

}Ol9 56 ll0 5

soo2o4o de