Text
C6fiCI.[
_CISOn Jarua / 23, 1980 EF2
_,354 Mr.
wes C. Keppler, Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Suoject:
hterin Report of 10CFR50.55(e} Item an Reactor Auxiliary Building Re-duced Floce Load.
Dear Mr. Keppler:
On Decenber 27, 1979, Detroit Edison's Mr. L. A. Walker, Site Project Puality Assurance Engineer, telephoned Mr. F.J. Jacionski o' NRC Region III to report on a reduced floor load in the Reactor Auxiliary BuildPig at the Femi 2 Site.
The problem results from cut rebar.
So far, it has been decermined that 12 slabs are affected. Detroit Edison Engineering is presently analyzing the severity of the problem. A final report will be submitte,d to jou by May *23, 1980.
If you have any questions on this ratter, please contact our EF2 Site Project Quality Assurance Engineer.
Sincerely,
.Yhki kL%
s.
~
W.J. fahrner Project Manager Enrico Fermi 2 cc:
Mr. John G. Davis, Acting Director Office of Inspection and Enforcerrent Division of Reactor :nspection Comission U.S. Nuclear Regulatory Comission gl 0
Washington D.C.
20555