ML19257D545

From kanterella
Jump to navigation Jump to search
Responds to Unresolved Item of Insp Rept 50-271/79-17-05 on 791025.Position Constitutes Reiteration of Operational QA Program Which Was Approved by NRC
ML19257D545
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/24/1980
From: Moody D
VERMONT YANKEE NUCLEAR POWER CORP.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
WVY-80-17, NUDOCS 8002040589
Download: ML19257D545 (2)


Text

- #

VERMONT Y AN KEE NUCLEAR POWER CORPORATION J

Rt L s ,\ as NT osvoi J. E. Tribble aracy vo.

DEV/WPJ/AK ENGINEERING OFFICE DbT/JBI TURNPIKE Ro AO LHH wEsTeoRo. M ass ACHUSETTS 0158 f

' ' ' ' ' " " ' ' " ~ " ' ' " '

DEM/RJW January 24, 1980 FDB JRH '

GTD RMG United States Nuclear Regulatory Coc:=ission JGR Office of Inspection r i Enforcement RLS Region I DBP-2 631 Park Avenue BCS W of Prussia, PA 19406 RJC/JDC/ JCT HAA Attention: Office of Inspection snd Enforcement WFC-2 Mr. Eldon J. Brunner, Chief RWB Reactor Operations and Nuclear Support Branch JAM p3t

References:

(a) License No. DPR-28 (Docket No. 50-271)

I&E-Wash. (b) USNRC Letter to VYNPC, dated December 5, 1979' g3 (Inspection Report 50-271/79-17)

J. Abbey T. Dignan

Dear Slr:

J. Ritsher G. Andognini

Subject:

Unresolved Item (271n9-17-05)

Reference (b) identifies an item as being unresolved pending the licensee's R ek Vermont P. Henrickshormal Licensing submittal Fi1%)5 position enofunresolved additional item information to the NRC 271M9-17-05 is asfor review.

follows:

Besponse:

Our position en this item constitutes a reiteration of what has already been established in our Yankee Operational Quality' Assurance Program.

This Program has been designated as the YOQAP-1-A; bas been accepted by the USNRC Quality Assurance Branch, Division of Project Management; and has been approved by the USNRC Office of Inspection and Enforcement. This Program has been in effect since August 15, 1977 Our position as stated in T0QAP-1-A in 1977, remains the same, and is reiterated as follows:

"The plant Technical Specifications shall be the governing document whec determining requirements to be imposed in all areas which are addressed in both Technical Specifications and the above noted Guides and Standards."

The referenced Guides and Standards are those listed in Section II of go/

YOQAP-1-A.

\b B002 04 0 M7

s - -

United States Nuclear Regulatory Commission Mr. Eldon J. Brunner, Chief Page 2 We trust this information will be satisfactory. Should additional information be required, please feel free to contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION

% D. E. Moody Manager of Operations RJW/sec

. e e

t' 1867 037

.