e FI :AL REPORT FOR PRD :;0. 79/11 U I.] j AS DEFIT,23 I:i 10 CF" 50.33 (c)

I. Description of Deficiency Control device assemblies used on 4.16 'J/ switchpar , o.>

switchgear, 480 V load centers were found with .airl;nc ca.~.

An inspection of control device assemblies en mitch;;ca. .a load centers was performed. This ir. spec tion f ound app ru:.c.a te.

180 control device assemblics with cracks.

II. Safety Implication:

The supplier has conducted endurance, torque, force a::J .acr=al cycle tests to determine the cause and si3aitic; ace of tie irahier

!!o s tructural or control device malfunction resulteu Ju riu , th e.s c tes ts . In addition, '.Jyle Labc ra tories a t !!u n ts . ; 'le, A lab a. .

conducted a seismic simulation test to further de nans trata t'a c integrity of these control devices. ::o loss or i.gatracc.: uf function was evident. The cracks did not show any signs af pro-pagation.

It 1:, concluded, from the above, that these crac.:, vill .A ca :: ..:

in a control device failure of malfunction. TE2refora. it is not considered to be a reportable deficiency uith(n the ..u...., af 10 CFR 50.55(e).,

III. Ccrrective Ac tion Taken:

Details of our corrective actions will be summarized in L e a r e '.

Management Corrective Action Report, GG.' S :!o . 31, and will 'ae available for your review at the Grand Gulf jobsite.