ML19257D482

From kanterella
Jump to navigation Jump to search
Forwards LER 79-067/03L-0
Date released: 09/28/2019 Download: ML19257D482


LER 79-067/03L-0:on 791222,river Water Train Pumps Declared Inoperable Due to Faulty Level Switch Q5P25L5510. Caused by Moisture Entering Switch,Making Operation Erratic. Replaced Switch.Corrective Action Being Evaluated
ML19257D485
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/25/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257D485 (1)
Forwards LER 79-067/03L-0
ML19257D481
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/25/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257D481 (1)