-7#//- - Of23 fb/b I l 6
Federal Register Notice MJCLEAR RS3ULATCRY COMMISSICt1 ADVISCRY CCt4MITTEE CN REACTCR SAIS3UARDS Notice of Proposed Meetings In order to provide advance information regarding proposed meetings of the ACRS Subcommittees and Working Groups, and of the full Committee, the following preliminary schedule reflects the current situation, taking into account additional meetirgs which have been seneduled and meetings which have been postponed or cancelled since the last list of proposed meetings published September 20,1979 (44 FR 54558). Rose meetings which are definitely scheduled have had, or will have, and individual notice published in the Federal Register approximately 15 days (or cure) prior to the meeting.
Those Subcommittee and Working Group meetings for which it is anticipated that there will be a portion c all of the meeting open to the public are indicated by an asterisk (*).
It is expected that the sessions of the full Committee meeting designated by an asterisk (*) will be open in whole or in part to the public. ACRS full Coccittee meetings begin at 8:30 a.m. and Subco.:mittee and Working Group meetings usually begin at 8:30 a.m.
te exact time when items listed en the agenda will be discussed during full Ccamittee meetings and when Subcommittee and Working Group meetings will start will be published prior to each meeting. Information as to whether a meeting has been firmly scheduled, cancelled, or rescheduled, or whether changes have been made in the agenda for the November 1979 ACRS full Cormittee meeting can be obtained by a prepaid telephone call to the Office of the Executive Director of the Ccemittee (telephone 202/634-3267, A""J:
Mary E. Vanderholt) between 3:15 a.m. and 5:00 p.m., C before, and EST af ter, Cetober 28, 1979.
1864 075 8 00e 040 005
~ SUSCCMMI" TEE AND WCRKIZ GROUP MEETECS
- .a Crosse Boiling Water Reactor, Cetober 26, 1979, Washington, DC.
RESCHEDULED FRCM OCTCBER 19, 1979. Be Subecmittee will consider proposed changes to the existing spent fuel storage p:o1 to accommodate a larger number of spent fuel assemblies. Notice of this meeting was published October 12, 1979.
- Three Mile Island, Unit 2, October 30, 1979, Washington, DC.
Be Subcommittee will review the NRC Inspection and Enforcement Report (NURS3-0600) pertaining to the "MI-2 Accident. Notice of tnis meeting was published Cetober 15, 1979.
- Waste Management, October 31, 1979, Washington, DC.
te Subcommittee will discuss NRC progra s on high-level waste, low-level waste, and uranium mill tailings, the objectives and goals of these prograns, and the priorities of the research and technical assistance projects to meet these goals. Notice of this meeting was published October 16, 1979.
- "'hree Mile Island, Unit 2 Accident - Imolications Re Nuclear Power Plant Design, Nove-ter 5,1979, Washington, DC.. RESCHEDULED FRCM NOVEMBER 7,1979. An Ad Hoc
_.icommittee will centinue its discussion of the implications of the 'IMI-2 Accident.
- Metal Cemeenents, November 5,1979, Washington, DC.
t e Subccamittee will discuss pipe crack with the ShR CWners Group, and will consider unresolved generic issues which are pertinent to its purview, such as inservice inspection and WR piping.
,.,^
1864 076
m 3-
- Reactor Safety Research, November 6 (morning) and November 7 (afternoon),1979, Washington, DC.
The Subcommittee will discuss preparation of the ACRS Annual Report to Congress on the NRC Reactor Safety Research Program. Notice of this meeting was published September 20, 1979.
Reliability and Probabilistic Assessment, November 6 (afternoon) and November 7 (corning),1979, Washington, EC.
B e Subcommittee will meet with rcrresentatives of the Federal Republic of Germany Reactor Safety Committee (REURSK), the Federal Republic of France Groute Permanent Reactors (FREGPR), the Electricite de France (ECF), and the United Kingdom Atomic Energy Authority (UMEA) to discuss the development and use of possible quanitative risk assessment criteria for nuclear power reactors.
- Reculatory Activities, November 7,1979, Washington, DC.
D e Subcommittee will review regulatory guides and revisions to existing regulatory guides; also, it may discuss pertinent activities which affect the current licensing process and/or reactor operation. Notice of this meeting was published September 20, 1979.
O.ree Mile Island, Unit 2 Accident - Imolications Re Nuclear Power Plant Desicn, Nove.-iber 7,1979, Washington, DC.
RESCHEDULED TO NCVEMBER 5,1979.
Notice of this meeting was published September 20, 1979.
- General Electric Test Reactor, November 14, 1979, San Francisco, CA.
Se Subec raittee will discuss seismic design recuirements that may be imposed as a result of recent geologic investigations.
Notice of this meeting was published September 20, 1979.
1864 077
_
- Extreme External Phenomena, November 15-16, 1979, Los Angeles, CA.
Be Subcom-mittee will discuss the NRC-spansored Seismic Safecy Margins Research Program.
Notice of this meeting was published September 20, 1979.
, Fluid Dvnanics, November 16, 1979, San Francisco, CA.
Se Subcommittee will meet to continue its review of topics related to the SWR Mark I Containment Long-Term Program and the NRC Acceptance Criteria for the containment structure.
- Floating Nuclear Plant, November 17, 1979, Los Angeles, CA.
We Subcommittee will discuss the proposed design of the core ladle and implications of the EI-2 Accident on the Floating Nuclear Plant design.
- Advanced Reactors, November 29-30, 1979, Albuquerque, NM.
te Subcommittee will discuss the NRC-sponsored research at Sandia and LASL on the safety of advanced reactors. Notice of this meeting was g:blished September 20, 1979.
- Reactor Safety Research, December 4,1979, Washington, EC.
RESCHEDLE.ED TO JANUARY 8, 1980. Notice of this meeting was published September 20, 1979.
- Reliability and Probabilistic Assessment, December 4,1979, Washington, DC.
The Subcommittee will discuss the role quantitative risk criteria might play in the licensing of nuclear power plants.
- Three Mile Island, Unit 2 Accident - Imelications Re Nuclear Power Plant Desicn, Dece.ber 4,1979 (Tentative), Washington, EC.
An Ad Hoc Subco:raittee will continue its discussion of the implications of the NI-2 Accident.
1864 078
. *Reculatory Activities, December 5, 1979, Washington, DC.
De Subcommittee will review regulatory guides and revisions to existing regulatory guides; also, it may discuss pertinent activities which affect the currenc licensing process and/or reactor operation.
- Power and Electrical Systems, December 13, 1979, Washington, DC.
We Subcommittee will discuss several miscellaneous items with regard to electrical power, instrumen-tation, control, and protection systems in nuclear power plants.
- Reactor Safety Research, January 8,1980, RESGEDULED FRCM DECDGER 4,1979, Washington, DC.
De Subcommittee will continue its discussion of preparation of the ACES Annual Report to Congress on the NRC Reactor Safety Research Program.
ACRS ?JLL CCP_".I"' TEE MEETUCS November S-10, 1979 Operating License.
A.
- Diablo Canyon Nuclear Pcwer Station, Units 1 & 2 Operating License.
S.
- Secuoyah Nuclear Plant C.
- ".cGuire Nuclear Station, Units 1 & 2 - Cperating License.
D.
- Nuclear Reculatorv Process - Adequacy of process including implementation of ACRS recommendations.
E.
- NRC Inscection and Enforcement Investigation into the March 28, 1979 Three Mile Island Accident (NUREG-0600)
- Evaluation of accident secuence/causes.
Evaluation of high pressure-high F.
- Salem Nuclear Generating Station, Unit 1 temperature line failure outside containment of this type nuclear plant.
1864 079
. G.
- Proocsed Changes in NRC Reculatorv Guides - Adequacy of prooosed changes.
H.
- Resolution of Generic Safety Issues Applicable to Light-Water Reactors Proposed plan of action /ACRS involvement in resolution of generic safety issues.
December 6-8, 1979
- Agenda to be announced.
Januarv 10-12, 1980 - Agenda to be announced.
[ eu,/[f/O 9 I' John C.
y1 Date
!AdvisoryCocnittee Management Officer 1864 080