Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. No Switches Installed.No Plans to Install Switches in safety-related Sys
ML19257D226
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/03/1980
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-28, NUDOCS 8002010550
Download: ML19257D226 (2)


Text

.

CAN74 L ftdJ PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 SHIEsDS L. DALTROFF ELacTasc Pn o c oN January 3, 1980 Docket Nos. 50-277 50-278 IE Bulletin 79-28 Mr. Boyce H. Grier, Director Office of Inspection & Enforcement Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Grier:

This letter is in response to IE Bulletin 79-28, forwarded to us on December 7, 1979 concerning the p os sible malfunction of NAMCO Model EA 180 limit switches at elevated temperatures.

The

" Actions to Be Taken by Licensees" and our response are treated sequentially.

Actions g B_e,Taken h Licensees 1.

Determine if your facility has installed or plans to install NAMCO EA 180 switches in any safety-related equipment located inside or outside containment, including valve p osition indicating circuitry related to containment isolation valves.

]{ [}

Response

NAMCO EA 180 switches have not been installed and there are no plans to install them in safety-related equipment. 2. If such switches are identified, examine the f ou r digit number stamp ed on the conduit boss of the switch housing. If this number falls between 02-79 and 08-79, replace the t op gasket of the switch in accordance with 60020105 50

i Mr. Boyce H. Grier Page 2 the manuf actu re r 's recommendations provided in the enclosed letter.

Response

Not applicable since we do not have NAMCO EA 180 switches in safety-related equipment. 3. Submit your plans and p rograms, including schedules for corrective actions, regarding your findings in response to Items 1 and 2 above.

Response

Not applicable since we do not have NAMCO EA 180 switchos in safety-related equipment. Very truly you rs, f ,/~' '/ cc: US Nuclear Regulatory Commission Office of Inspection & Enforcement Division of Reactor Operations Inspection Washington, DC 20555 i i857 140}}