ML19257C928

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1100 /79-08 & on 790924-28.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Storage & Internal Control & Physical Inventory. Details Withheld (Ref 10CFR2.790)
ML19257C928
Person / Time
Site: 07001100
Issue date: 11/23/1979
From: Cohen I, Joyner J, Zibulsky H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19257C913 List:
References
70-1100-79-08, 70-1100-79-8, NUDOCS 8001310090
Download: ML19257C928 (1)


Text

<

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.

70-1100/79-08 Docket No.

70-1100 License No.

SNM-1067 Safeguards Group 3

Licensee:

Combustion Engineering, Incorporated P.O. Box 500 Windsor, Connecticut 06095 Facility Name:

Nuclear Power Systems - Manufacturing Inspection At:

Windsor, Connecticut Inspection Conducted:

September 24-28, 1979 Date of Last Material Control and Accounting Inspection:

July 26, 1979 Type of Inspection:

Urpnnounced Material Control & Accounting Inspectors:

d'lN i

. Cohen,' Chemist date M 2 4s/rk / T'

//- 2 3-79 H. Zibulsky, fpemist "

date date M

//-2 3-7 9 Approved by:

wu g

H.' Joyner LChief, Nuclear Material Control date and Support Section, Safeguards Branch Inspection Summary:

Areas Inspected:

Facility organization, facility operation, storage and internal control and physical inventory.

The inspection involved 52 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.

Results:

The licensee was found to be in compliance with NRC requirements in the four areas examined.

1843 062 800131 009 O Region I Form 166 (August 1979)