U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.
70-1100/79-08 Docket No.
70-1100 License No.
SNM-1067 Safeguards Group 3
Licensee:
Combustion Engineering, Incorporated P.O. Box 500 Windsor, Connecticut 06095 Facility Name:
Nuclear Power Systems - Manufacturing Inspection At:
Windsor, Connecticut Inspection Conducted:
September 24-28, 1979 Date of Last Material Control and Accounting Inspection:
July 26, 1979 Type of Inspection:
Urpnnounced Material Control & Accounting Inspectors:
d'lN i
. Cohen,' Chemist date M 2 4s/rk / T'
//- 2 3-79 H. Zibulsky, fpemist "
date date M
//-2 3-7 9 Approved by:
wu g
H.' Joyner LChief, Nuclear Material Control date and Support Section, Safeguards Branch Inspection Summary:
Areas Inspected:
Facility organization, facility operation, storage and internal control and physical inventory.
The inspection involved 52 inspector-hours onsite by two NRC inspectors and was begun during the regular hours.
Results:
The licensee was found to be in compliance with NRC requirements in the four areas examined.