ML19257C909
| ML19257C909 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 12/06/1979 |
| From: | Cohen I, Joyner J, Shaub T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19257C907 | List: |
| References | |
| 70-0820-79-15, 70-820-79-15, NUDOCS 8001310072 | |
| Download: ML19257C909 (1) | |
Text
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No. 70-820/79-15 Docket No.70-820 License No.
SNM-777 Safeguards Group 1
Licensee:
United Nuclear Corporation Wood River Junction, Rhodre Island 02894 Facility Name:
UNC Recovery Systems Inspection At:
Wood River Junction, Rhode Island Inspection Conducted:
October 23-26, 1979 Date of Last Material Control and Accounting Inspection:
September 14,19/9 Type of Inspection: Announced Material Control & Accounting
);f Ao[] $
Inspectors:
- k. Cohen, Chemist
)
qate Y
n/4/79 T. Shauo, Safeguards Technician
' da'te
/2//c /? 9 P.Bissett,Safehrdduditor
/ date O. Q n I c,l ? 9
. Summers, Safeguards Auditor
'dath '
Approved by:
<DE, W 12/4/W
}'. Hyo}h6r, Chief, Nuclear Materials Control
/ d' ate Support Section, Safeguards Branch Inspection Summary:
Areas Inspected:
Inventory Verification and Management of Materials Control System.
The inspection involved 99 inspector-hours onsite by four NRC inspectors and was begun during the regular hours.
Results:
The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.
1843 051 Region I Form 166 (August 1979) 8 0 01310 07 k
.