ML19257C909

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0820/79-15 on 791023-26.No Noncompliance Noted.Major Areas Inspected:Inventory Verification & Mgt of Matls Control Sys.Details Withheld (Ref 10CFR2.790)
ML19257C909
Person / Time
Site: Wood River Junction
Issue date: 12/06/1979
From: Cohen I, Joyner J, Shaub T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19257C907 List:
References
70-0820-79-15, 70-820-79-15, NUDOCS 8001310072
Download: ML19257C909 (1)


Text

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No. 70-820/79-15 Docket No.70-820 License No.

SNM-777 Safeguards Group 1

Licensee:

United Nuclear Corporation Wood River Junction, Rhodre Island 02894 Facility Name:

UNC Recovery Systems Inspection At:

Wood River Junction, Rhode Island Inspection Conducted:

October 23-26, 1979 Date of Last Material Control and Accounting Inspection:

September 14,19/9 Type of Inspection: Announced Material Control & Accounting

);f Ao[] $

Inspectors:

k. Cohen, Chemist

)

qate Y

n/4/79 T. Shauo, Safeguards Technician

' da'te

/2//c /? 9 P.Bissett,Safehrdduditor

/ date O. Q n I c,l ? 9

. Summers, Safeguards Auditor

'dath '

Approved by:

<DE, W 12/4/W

}'. Hyo}h6r, Chief, Nuclear Materials Control

/ d' ate Support Section, Safeguards Branch Inspection Summary:

Areas Inspected:

Inventory Verification and Management of Materials Control System.

The inspection involved 99 inspector-hours onsite by four NRC inspectors and was begun during the regular hours.

Results:

The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.

1843 051 Region I Form 166 (August 1979) 8 0 01310 07 k

.