DEFR-791213:loss of Adhesion Between Successive Layers of in-containment Coatings Detected.Caused Undetermined
ML19257C733
Person / Time
Site: Midland
Issue date: 12/13/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19257C731 List:
References
HOWE-309-79, NUDOCS 8001300209
Download: ML19257C733 (4)


Text

.

g]l

' ' '-* d UV 4

4. Q ggg h

P0'il8r i

~

U 5tephen H. Howell

.$rnier Vice hrsadent General offleca: 1945 West Parnell Road, Jackson, Michigan 49201 + (517) 788 0453 Dece=ber 13, 1979 Ecve-309-79 A l9f Mr J G Keppler t'

  1. 4 Regicnal Director 2

<Y

,o Office of Inspection & Enforcement

' r!

', [> j 'Q

/

US Nuclear Regulatory C -ission q,', Q,*g g i~

o Regien III 799 Roosevelt Read 4

N Glen Ellyn, TL 60137

'i

- /

AIDLAIID NUC 9 PLA !T s'

UNIT NO 1, DOCKET No 50-329 UNIT NO 2, DCCKII NO 50-330 CC?CAIN!GT INTERNAL STRUCTURES COATING DEFICIENCY In accordance with the requirements of 10 CFR 50.55(e), this letter constitutes an interi= report en in-centain=ent coatings which have a loss of adhesien between successive layers of the coating syste=.

The attach =ents to this letter provide a =cre ce=plete description of the condition and the status of the actions being taken.

Another repert, either interim or final, vill be sent en er before February 15, 1979 r-~~

.\\

.C.

'~

G

'a?2/1r Attachnent s:

1.

Quality Assurance Progra=, Managenent Corrective Action Report, MCAR-1, Report 35, dated November 13, 1979 2.

MCAR-35, Interim Report #1, dated Nove=ber 30, 1979 CC: Director of Cffice of Inspection and Enforce:ent Att: Mr Victer Stello, USNRC (15)

}8}h 33}

Director of Office of Management Information and Program Control, USNRC (1).

8001300 s

~

' 2 Hove-309-79 P.0C: JL3 acon, M-1085A VRBird, JSC-2163 JLCorley, Midland LHCurtis, Bechtel AA LADreisbach, Bechtel-Midland DEHern, Midland GSKeeley, Plk-h08B BW.arguglio, JSC-220A DBMiller, Midland MAPuschel, Pik-232 RLRi.-: ford, Bechtel AA JARutgers, Bechtel AA b ibbs, ILLE Great Lakes QA Ms.nagers File:

0.4 9 37 x

I 1835 332 9

q,

MCAR1 Hove-509-79 REPORT NO.

35

~

JOB NO.

7220 0028lb.

2.20 DATE November 13. 1979 0N I

  • DESCRIPTION (Including references): Epoxy decontaminative surfacer applied to Unit 2 containment, northwest primary shield vall and incore tunnel exterior faces from elevation 593'-6" to about 603'-0" exhibits a loss of adhesion between the Nu-Klad 117 (N) surfacer and Acercate 90 (N) top c u t.

This surfacer was applied by subcontractor J. L. Manta in accordance with requirements of subcontract No. A-15 and specification 7220-A-15(Q) utilising system no. 9 thin coat application.

This condition was first noted by CPCo resulting in issuance of CPCo MCR M01-4-9-132

~

(attached).

(Continued on page 2)

  • RECOMMENDED ACTION (Optional)

I.

Determine Root Cause.

r A.

Quantify by =apping and testing coated areas to determine extent of physical problem.

([

B.

Review design specification, subcontractor procedures and Quality records for acceptability of techniques, procedures, equip =ent, and materials used.

L C.

Perform analysis of caterials used for compliance with design and quality require-meats.

II.

Decemine reportability under 10CFR50.55(e) and advise QA no later than Nov. 30, 1979.

(Continued on page 2)

REFERRED TO O ENGINbERING O CONSTRUCTION OOA MANAGEMENT O

O PROCUREMENT ISSUED BY As cb II'lW l Prosect CA Entneer Date il REPORTABLE DEFICIENCY Potentially Reportable NOTIFIED CLIENT

/.//

O NO O YES 8

5'!M l

P..,ac Manager y Date '

111 CAUSE co

\\. t-l

_/S Cb

'~

/

gg r.

CORRECTIVE ACTICN TAKEN

-..gc, 3

gCY gg7 gA :

, h. c... @e $ g # 11 183-]-

.; 3.2 j

AUTHORIZED BY l

Dale iTANDARD CISTR:8UTICN ADOmONAL 01STAiBUTION. AS APPRCPRfATE ms.oM on waNaGIR INGA(E A8NG waNaGEm FORMAL REPORT TO CLIENT

.aNaosa or ca. rPo Pao 4 CreNG~ era (Il Section 11 Applies)

Date PD.04 wANAGE4 A40 PROCUAtutNT sUPP(fER ovaVTV MCA O Os un actm PnoJ

,P OJ CO Sim seaNaG(m ao4Cf wa=aGin C**(F CoNSTR QC f r GALER N','ao4Cr oeraaroNs uau*Gra

$sE PacCuae ue Nr uca CORRECTIVE ACTION IMPLEMENTED e

LOPROCu84u(NTwaNACIA Pno; Pmocum(ut N1 heca ao uom cs ING'N(f A'NG Div *A(R Quaufv MGM ao uGA QF CONSTRUCTCN VERIFIED BY o..u

. u-.

..... ". e ProfeCf CA Enoncer Date

\\

I 8001au g qy_

s

HCAR 35 L

liovember 13, 1979 Page 2 00281i DESCRIPTION:

(Con td)

/

Approximately 600 sq. ft. of surfacer is currently in question on primary shield and incore tunnel -ith 10-12 sq. ft. already removed during current investigation.

RECOMMENDED ACTION:

(Cont'd)

III.

Based upon the results of I, provide recoenended fix and acco=plish repair of defec~tive areas.

IV.

Take appropriate sr:eps to preclude recurrence.

V.

Provide report to QA by Novecher 30,1979 (interim or final).

I:

\\

e i

i835 534 9

e