Text
.
g]l
' ' '-* d UV 4
- 4. Q ggg h
P0'il8r i
~
U 5tephen H. Howell
.$rnier Vice hrsadent General offleca: 1945 West Parnell Road, Jackson, Michigan 49201 + (517) 788 0453 Dece=ber 13, 1979 Ecve-309-79 A l9f Mr J G Keppler t'
- 4 Regicnal Director 2
<Y
,o Office of Inspection & Enforcement
' r!
', [> j 'Q
/
US Nuclear Regulatory C -ission q,', Q,*g g i~
o Regien III 799 Roosevelt Read 4
N Glen Ellyn, TL 60137
'i
- /
AIDLAIID NUC 9 PLA !T s'
UNIT NO 1, DOCKET No 50-329 UNIT NO 2, DCCKII NO 50-330 CC?CAIN!GT INTERNAL STRUCTURES COATING DEFICIENCY In accordance with the requirements of 10 CFR 50.55(e), this letter constitutes an interi= report en in-centain=ent coatings which have a loss of adhesien between successive layers of the coating syste=.
The attach =ents to this letter provide a =cre ce=plete description of the condition and the status of the actions being taken.
Another repert, either interim or final, vill be sent en er before February 15, 1979 r-~~
.\\
.C.
'~
G
'a?2/1r Attachnent s:
1.
Quality Assurance Progra=, Managenent Corrective Action Report, MCAR-1, Report 35, dated November 13, 1979 2.
MCAR-35, Interim Report #1, dated Nove=ber 30, 1979 CC: Director of Cffice of Inspection and Enforce:ent Att: Mr Victer Stello, USNRC (15)
}8}h 33}
Director of Office of Management Information and Program Control, USNRC (1).
8001300 s
~
- ' 2 Hove-309-79 P.0C: JL3 acon, M-1085A VRBird, JSC-2163 JLCorley, Midland LHCurtis, Bechtel AA LADreisbach, Bechtel-Midland DEHern, Midland GSKeeley, Plk-h08B BW.arguglio, JSC-220A DBMiller, Midland MAPuschel, Pik-232 RLRi.-: ford, Bechtel AA JARutgers, Bechtel AA b ibbs, ILLE Great Lakes QA Ms.nagers File:
0.4 9 37 x
I 1835 332 9
q,
MCAR1 Hove-509-79 REPORT NO.
35
~
JOB NO.
7220 0028lb.
2.20 DATE November 13. 1979 0N I
- DESCRIPTION (Including references): Epoxy decontaminative surfacer applied to Unit 2 containment, northwest primary shield vall and incore tunnel exterior faces from elevation 593'-6" to about 603'-0" exhibits a loss of adhesion between the Nu-Klad 117 (N) surfacer and Acercate 90 (N) top c u t.
This surfacer was applied by subcontractor J. L. Manta in accordance with requirements of subcontract No. A-15 and specification 7220-A-15(Q) utilising system no. 9 thin coat application.
This condition was first noted by CPCo resulting in issuance of CPCo MCR M01-4-9-132
~
(attached).
(Continued on page 2)
- RECOMMENDED ACTION (Optional)
I.
Determine Root Cause.
r A.
Quantify by =apping and testing coated areas to determine extent of physical problem.
- ([
B.
Review design specification, subcontractor procedures and Quality records for acceptability of techniques, procedures, equip =ent, and materials used.
L C.
Perform analysis of caterials used for compliance with design and quality require-meats.
II.
Decemine reportability under 10CFR50.55(e) and advise QA no later than Nov. 30, 1979.
(Continued on page 2)
REFERRED TO O ENGINbERING O CONSTRUCTION OOA MANAGEMENT O
O PROCUREMENT ISSUED BY As cb II'lW l Prosect CA Entneer Date il REPORTABLE DEFICIENCY Potentially Reportable NOTIFIED CLIENT
/.//
O NO O YES 8
5'!M l
P..,ac Manager y Date '
111 CAUSE co
\\. t-l
_/S Cb
'~
/
gg r.
CORRECTIVE ACTICN TAKEN
-..gc, 3
gCY gg7 gA :
, h. c... @e $ g # 11 183-]-
.; 3.2 j
AUTHORIZED BY l
Dale iTANDARD CISTR:8UTICN ADOmONAL 01STAiBUTION. AS APPRCPRfATE ms.oM on waNaGIR INGA(E A8NG waNaGEm FORMAL REPORT TO CLIENT
.aNaosa or ca. rPo Pao 4 CreNG~ era (Il Section 11 Applies)
Date PD.04 wANAGE4 A40 PROCUAtutNT sUPP(fER ovaVTV MCA O Os un actm PnoJ
,P OJ CO Sim seaNaG(m ao4Cf wa=aGin C**(F CoNSTR QC f r GALER N','ao4Cr oeraaroNs uau*Gra
$sE PacCuae ue Nr uca CORRECTIVE ACTION IMPLEMENTED e
LOPROCu84u(NTwaNACIA Pno; Pmocum(ut N1 heca ao uom cs ING'N(f A'NG Div *A(R Quaufv MGM ao uGA QF CONSTRUCTCN VERIFIED BY o..u
. u-.
..... ". e ProfeCf CA Enoncer Date
\\
I 8001au g qy_
s
HCAR 35 L
liovember 13, 1979 Page 2 00281i DESCRIPTION:
(Con td)
/
Approximately 600 sq. ft. of surfacer is currently in question on primary shield and incore tunnel -ith 10-12 sq. ft. already removed during current investigation.
RECOMMENDED ACTION:
(Cont'd)
III.
Based upon the results of I, provide recoenended fix and acco=plish repair of defec~tive areas.
IV.
Take appropriate sr:eps to preclude recurrence.
V.
Provide report to QA by Novecher 30,1979 (interim or final).
I:
\\
e i
i835 534 9