ML19257B979

From kanterella
Jump to navigation Jump to search
Forwards LER 79-103/03L-0
Date released: 09/28/2019 Download: ML19257B979


LER 79-103/03L-0:on 791227,while Performing Surveillance on Reactor Core Isolation Cooling Sys Flow Instrument,High Switch Exceeded Tech Specs.Caused by Instrument Drift.Switch Was Recalibr & Surveillance Performed Satisfactorily
ML19257B988
Person / Time
Site: Hatch 
Issue date: 01/17/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B988 (2)
Forwards LER 79-103/03L-0
ML19257B978
Person / Time
Site: Hatch 
Issue date: 01/17/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B978 (1)