ML19257B958

From kanterella
Jump to navigation Jump to search
Forwards Resin Liner Dewatering Study. Concludes That Capability Exists to Dewater Liner to Between 0.2% & 0.3% Freestanding Water
ML19257B958
Person / Time
Site: Crane 
Issue date: 11/30/1979
From: Wilson R
METROPOLITAN EDISON CO.
To: Jay Collins
NRC - NRC THREE MILE ISLAND TASK FORCE
Shared Package
ML19257B957 List:
References
NUDOCS 8001220151
Download: ML19257B958 (1)


Text

'

s y

pfy jg Metropolitan Edison Company Igj

,9

$g f[ h JJ Post Office Box 480 Middletown, Pennsylvania 17057 717 94446M 948-8401 November 30, 1979 Mr. John T.

Collins Nuclear Regulatory Commission Trailer #1 Three Mile Island Middletown, Pennsylvania 17057 TMI-2 Resin Liner Dewatering Study Tests Attached for your review is the report summarizing all of the work and studies directed toward dewatering of TMI-2 resin liners.

Based upon the study we conclude that prior to shipment the capability exists to dewater J.e liner to between 0.2 and 0.3% free standing water.

It can be expected that shipment of the liners may affect any remaining free water and that liner receipt at the burial ground site may show between 0.3 and 0.4% free standing water.

It is our understanding that this degree of free water meets his-torical shipping and burial site requirements.

Upon your review of the attachment, we will finalize procedures to insure shipments are dewatered consistent with the developmental results.

Very ruly yours, I

R1 h'ar 1 son Director TMI-2 RFW:rdg Attachments cc:

R.

C.

Arnold J. J.

Barton P.

Deltete J.

C.

DeVine E.-

Fuller J.

G.

Herbein R.

J.

McGoey 1784 075 Metrcoolitan Edison Company !s a Vember of the General Pubbc Utuies Sys:em 80 012 201 N