ML19257B952

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Relays Not in Use in safety-related Sys.Util Awaiting Response from Class IE Suppliers Re Future Use.Requests Extension Until 800301
ML19257B952
Person / Time
Site: Marble Hill
Issue date: 12/20/1979
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-25, NUDOCS 8001210313
Download: ML19257B952 (1)


Text

hY*

4;7l 7 ,

/ <

. a. /

PUBLIC SERVICE g g December 20, 1979 S. W. Shields Vice President . Electric System Mr. James G. Keppler, Director Docket Nos.: STN 50-546 U.S. Nuclear Regulatory Commission STN 50-547 Region III Construction Permit Nos. :

799 Roosevelt Road CPPR-170 Glen Ellyn, Illinois 60137 CPPR-171 Marble Hill Muclear Generating Station, Units 1&2 IE Bulletin No. 79-25 uear Mr. Keppler:

The Westinghouse family of BF relays was also the subject of a 1976 cir-cular (IE Circular 76-02) . This earlier circular triggered precautionary measures on the plant design. None of the Marble Hill safety-related specifications call for the use of BFD or NBFD type relays. To further confirm this position, notifications are being issued to all Marble Hill Class 1E suppliers requesting written confirmation that BFD and NBFD re-lays will not be used.

However, receipt of this information from our suppliers will require addi-tional time. We have been ir. formed by our architect-engineer (Sargent 6 Lundy) that receipt of this information will be completed in February,1980.

We therefore request an extension to March 1, 1980 for our response to this bulletin.

Since ely,

! Q

. W. Shields TDG:jb cc: U.S. Nuclear Regulatory Cocnission Office of Inspection and Enforcement Division of Reactor Operation Inspection Washington, D. C. 20555 E. R. Schweibinz, P. E. .

17.74 281 ol e 103 '3

~

DEC 2 01979 1000 Eas' Main Street, Plainfield, Indona 46168 317 .839 .9611