ML19257B824

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Relays Not Used in safety-related Sys
ML19257B824
Person / Time
Site: Zimmer
Issue date: 12/20/1979
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-25, NUDOCS 8001210012
Download: ML19257B824 (1)


Text

-

Mb glU ; Q w

1 Lu. _ _

" ~ ' "

THE CINCINNATI GAS & ELECTRIC CC'MPANY

n~

CINCINN ATI. OHIO 45201 December 20, 1979 E. A. BORGM ANN vecc passiocht U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 ATTN:

Mr. James G.

Keppler Regional Director RE:

101. II. ZIIDIER NUCLEAR POWER STATION - UNIT 1 IE BULLETIN 79-25, FAILURE OF WESTINGHOUSE BFD RELAYS IN SAFETY-RELATED SYSTEMS DOCKET 50-358, N.O.

57322, JOB E-5590, FILE # 956 Gentlemen:

This letter is in response to IE Bulletin 79-25 concerning failure of Westinghouse type BFD and NBFD relays in safety-related systems.

These relays are not utilized in safety related systems at the Wm. II. Zimmer Nuclear Power Station - Unit 1 Power Plant.

This Bulletin is therefore not applicable to this facility.

Very truly yours, Tile CINCINNATI GAS 6 ELECTRIC COMPANY r.%

E.A. BORGMANN, SENI R VICE PRESIDENT WPC/kjd cc:

U.S.

Nuclear Regulatory Commission R.F. Sche bel R.E. Cotta W.D. Waymire S.G. Salay J.R. Schott J.D.

Flynn C.W.

Beringhaus B.K.

Culver ll. C. Brinkmann 772 350' DEC 2 S 1873 8001210 01