ML19257B782

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Nuclear Instrumentation Reactor Protection Sys Grounding Concern.B&W Periodic Test Program Instituted for Cabinets to Provide Assurance That Ground Connection Not Lost & to Obtain Baseline Data
ML19257B782
Person / Time
Site: Midland
Issue date: 01/11/1980
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
HOWE-4-80, NUDOCS 8001180333
Download: ML19257B782 (2)


Text

.

O:" Consumers '

1 d I' D000r f g eg Stephen H. Howell Senior Vice President

'/

General of fices: 1945 West Pernall Fload, Jackson, Michigan 49201 * (517) 788 4453 January 11, 1980 Hove-h-80 Mr J G Keppler, Regional Director Office of Inspection and Enforcement Region III US Huclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND UUCLEAR PIJJIT UNIT N0 1, DOCKET Ho 50-329 UNIT NO 2, DOCKFr NO 50-330 NI/RPS GROUNDING CONCERN

Reference:

1) Letter, S H Howell to J G Keppler; Midland nuclear Plant; Unit No 1, Dceket No 50-329; Unit No 2, Docket No 50-330; NI/RPS Grounding Concern; Hove-h8-78; dated April 6,1978
2) Letter, S H Howell to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit no 2, Docket No 50-330; NI/RPS Grounding Concern; Hove-85-78; dated May 30, 1978
3) Letter, S H Howell to J G Keppler; Midland Huclear Plant; Unit No 1, Docket No 50-329; Unit no 2, Docket no 50-330; NI/RPS Grounding Concern; Hove-152-78; dated August 30, 1978 h) Letter, S H Howell to J G Keppler; Midland Huclear Plant; Unit No 1, Docket No 50-329; Unit no 2, Docket No 50-330; NI/RPS Grounding Concern; Hove-237-78; dated August 31, 1979 The referenced letters were interim reports. This letter is a final 50.55(e) report regarding the above subject. CPCo vill institute the B&W periodic test program for the UI/RPS cabinets in order to provide assurance that the Ground connection has not been lost and to obtain baseline data. As indicated in Reference h, the B&W test specification (No 62-1005067-00) was revised to include this test program. The detailed CPCo implementing procedures will be based on the E&W test specification. Releare of these procedures has been rescheduled to be compatible with the overall Project schedule.

'Wp WRB/1r 6 i770 304 8001180

2 Hove 1 -80 4

CC: Director of Office of Inspection and Enforcement Att: Mr Victor Stello, USIIRC (15)

Director of Office of Management Information & Program Control, USIIRC (1) h 1770 305

.