ML19257B649
| ML19257B649 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/03/1980 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-79-25, NUDOCS 8001180040 | |
| Download: ML19257B649 (1) | |
Text
-
TC U-0115 ILLINO/S POWER COMPANY tog go(91_g3)_o 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 January 3, 1980 Mr. James G.
Keppler Director Region III Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permits No. CPPR-137 & CPPR-138 This is in reply to your letter of November 2,1979 whereby you forwarded IE Bulletin No. 79-25 which reported on a problem encountered with Westinghouse BFD relays.
Please be advised that Westinghouse type BFD relays as ref-erenced in the iE Bulletin will not be used with any safety related services at the Clinton Power Station.
Sincerely,
/
G.
E. Wuller Supervisor - Licensing ALR/jh Generation Engineering Department cc:
Director, Division of Reactor Operations Inspection Office of Inspection & Enforcement, USNRC 1768 042 3 AM 7 1980 800118o0 40