ML19257B542

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 7 to Critical Experiments,Measurements & Analysis to Establish Crack Arrest Methodology for Nuclear Pressure Vessel Steels. Contractor:Battelle Columbus Labs
ML19257B542
Person / Time
Issue date: 12/12/1979
From: Mynatt W
NRC OFFICE OF ADMINISTRATION (ADM)
To:
Shared Package
ML19257B543 List:
References
CON-FIN-A-4046, CON-NRC-04-76-293, CON-NRC-4-76-293 NUDOCS 8001170058
Download: ML19257B542 (2)


Text

'

CONTRACT No.ocR NRC-04-76-293-06 NRC l ORM 255 Task Agreement No. 6 4 o 7s, MOOlFICATION NUMBER DIVISION OF CON TR ACTS U.S. NUCLE AR REGULATORY COMMISSION WASHINGTON. O.C. 705$5 ONEW 0.f MODIFICATIO*.

OTHE R ispec,fy)

NOTIFICATION OF CONTRACT EXECUTION CONTRACT BASED ON:

Polly Schofield AUTHORIZATION NUMBER To-*

RES-76-293-06 DATE RES / /'

l lI' Lp9 7 ff ) /,N,'s,j.'/ f & "

CONTRACT CHANGES PER THis ACTION b

'f/'*

// / ' ' (/

gN 4 1960 Add'l work and funds for

' m. " Allen Myna t FRoM:

Ioetel authorized work to be performed teo$ti,ce succ.,r,st/

in FY'80 i

Research Contracts Branch l

DIVISION OF CONTRACTS, ADM EXECUTION DATE CONTR ACTOR INa,ne & Locar,on/

Battelle Columbus Laboratories Columbus, OH TYPE OF CONTRACT CPFF PERIOD OF PERFORMANCE PROJECT TITLE thru 9/30/80

" CRITICAL EXPERIMENTS, MEASUREMENTS, AND ANALYSIS TO ESTABLISH A CRACK ARREST PRINCIPAL INVESTIGATOR METHODOLOGY FOR NUCLEAR PRESSURE M.SSEL STEELS" Rosenfield NRC AUTHORIZED REPRESENTATIVE Vagins FIN NUMBER AMOUNT D&R NUMBER 60-19-11-05 A4046 S 95,000.00 NEW NRC FUNDS 95,000.00 FUNDING S

TOTAL FY 8 FUNDING S

TOTAL NRC OBLIGATIONS AT T ACH ME N 7(S):

GOVERNMENT FROPERTY N/A 5

CONT R ACT DOCUMENT ( _

}

NRC (ORM 256 1766 032 soon n6 f10 763

2 TASK 3 - HSST SUPPORT ACTIVITIES _

KID, AND FOR TSE-5 MATERIA [C PROPAGAT K

3-1 MEASURE FRACTURE TOUGHNESS (STATIC: IN CIRCUMFERENTIAL AND CRACK ARREST: K )

AXIAL DIRECTIONS 3-2 PROVIDE SAME TOUGHNESS DATA ON TSE-5A MATERIAL.

3-3 ANALY2E THE CIRCUMFERENTIAL CRACK IN TSE-5.

3-4 PROVIDE A DYNAMIC ANALYSIS OF TSE-5A.

COMPARE THE ANALYTICAL PREDICTIONS WITH TSE-5 AND TS 3-5 WELL AS THOSE OF AVAILABLE CRACK ARREST THEORIES.

USE THE FINITE-ELEMENT, ELASTIC / PLASTIC ANAL SIS METHODOLOGY TO ASSESS 3-6 THE PROBABILITY OF CRACK TIP BLUNTING IN TSE-5.

TASr. 4 - COLD LEG INTEGRITY _

ASSIST IN THE EVALUATION OF THE FRACTURE POTENTIAL nF COLD LEG PIP PWRS.

InPhragraph2., Term,deletethedate" November 30, 1979" and insert the date B.

" September 30, 1980" in lieu thereof.

In Paragraph 3., Estimate of Cost, Fixed Fee, Obligation of Funds, delete the C.

and insert the amounts "$1,358,831.00," "595,169.00," and "51,454,000.00" amot.nts "$1,447,621.00," "$101,379.00," and "$1,549,000.00," respectively, in lieu thereof.

1766 033

~

-