ML19257B542
| ML19257B542 | |
| Person / Time | |
|---|---|
| Issue date: | 12/12/1979 |
| From: | Mynatt W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | |
| Shared Package | |
| ML19257B543 | List: |
| References | |
| CON-FIN-A-4046, CON-NRC-04-76-293, CON-NRC-4-76-293 NUDOCS 8001170058 | |
| Download: ML19257B542 (2) | |
Text
'
CONTRACT No.ocR NRC-04-76-293-06 NRC l ORM 255 Task Agreement No. 6 4 o 7s, MOOlFICATION NUMBER DIVISION OF CON TR ACTS U.S. NUCLE AR REGULATORY COMMISSION WASHINGTON. O.C. 705$5 ONEW 0.f MODIFICATIO*.
OTHE R ispec,fy)
NOTIFICATION OF CONTRACT EXECUTION CONTRACT BASED ON:
Polly Schofield AUTHORIZATION NUMBER To-*
RES-76-293-06 DATE RES / /'
l lI' Lp9 7 ff ) /,N,'s,j.'/ f & "
CONTRACT CHANGES PER THis ACTION b
'f/'*
// / ' ' (/
gN 4 1960 Add'l work and funds for
' m. " Allen Myna t FRoM:
Ioetel authorized work to be performed teo$ti,ce succ.,r,st/
in FY'80 i
Research Contracts Branch l
DIVISION OF CONTRACTS, ADM EXECUTION DATE CONTR ACTOR INa,ne & Locar,on/
Battelle Columbus Laboratories Columbus, OH TYPE OF CONTRACT CPFF PERIOD OF PERFORMANCE PROJECT TITLE thru 9/30/80
" CRITICAL EXPERIMENTS, MEASUREMENTS, AND ANALYSIS TO ESTABLISH A CRACK ARREST PRINCIPAL INVESTIGATOR METHODOLOGY FOR NUCLEAR PRESSURE M.SSEL STEELS" Rosenfield NRC AUTHORIZED REPRESENTATIVE Vagins FIN NUMBER AMOUNT D&R NUMBER 60-19-11-05 A4046 S 95,000.00 NEW NRC FUNDS 95,000.00 FUNDING S
TOTAL FY 8 FUNDING S
TOTAL NRC OBLIGATIONS AT T ACH ME N 7(S):
GOVERNMENT FROPERTY N/A 5
CONT R ACT DOCUMENT ( _
}
NRC (ORM 256 1766 032 soon n6 f10 763
2 TASK 3 - HSST SUPPORT ACTIVITIES _
KID, AND FOR TSE-5 MATERIA [C PROPAGAT K
3-1 MEASURE FRACTURE TOUGHNESS (STATIC: IN CIRCUMFERENTIAL AND CRACK ARREST: K )
AXIAL DIRECTIONS 3-2 PROVIDE SAME TOUGHNESS DATA ON TSE-5A MATERIAL.
3-3 ANALY2E THE CIRCUMFERENTIAL CRACK IN TSE-5.
3-4 PROVIDE A DYNAMIC ANALYSIS OF TSE-5A.
COMPARE THE ANALYTICAL PREDICTIONS WITH TSE-5 AND TS 3-5 WELL AS THOSE OF AVAILABLE CRACK ARREST THEORIES.
USE THE FINITE-ELEMENT, ELASTIC / PLASTIC ANAL SIS METHODOLOGY TO ASSESS 3-6 THE PROBABILITY OF CRACK TIP BLUNTING IN TSE-5.
TASr. 4 - COLD LEG INTEGRITY _
ASSIST IN THE EVALUATION OF THE FRACTURE POTENTIAL nF COLD LEG PIP PWRS.
InPhragraph2., Term,deletethedate" November 30, 1979" and insert the date B.
" September 30, 1980" in lieu thereof.
In Paragraph 3., Estimate of Cost, Fixed Fee, Obligation of Funds, delete the C.
and insert the amounts "$1,358,831.00," "595,169.00," and "51,454,000.00" amot.nts "$1,447,621.00," "$101,379.00," and "$1,549,000.00," respectively, in lieu thereof.
1766 033
~
-