Recommends Guidelines for Hpis Safe Shutdown.Actuation of Hpis/Lpis Should Not Be Bypassed or Otherwise Prevented Except in Normal,Controlled Plant Shutdown
ML19257B531
Person / Time
Site: Crane, Davis Besse  
Issue date: 11/01/1977
From: Joseph Kelly
BABCOCK & WILCOX CO.
To:
BABCOCK & WILCOX CO.
References
TASK-TF, TASK-TMR NUDOCS 8001160765
Download: ML19257B531 (1)


Text

W Y ' D[ ". f'". W Q.%

l.W:.

Distribution b=

J. J. Kelly, Plan: !=:egratie:

af/

C u.s...

/

File No.

Cenerie or Ref.

g3 Subj.

Date Cus c c Guidance On Eigh ?ressure Injec:ica Opera.ica i,m............................-.......

Nove:ber 1, 1977 DISTF,I3UTION KCLU/ NEr-c

3. A. Karrasch IJQV l, l h l /

D. W. I.a3elle E. W. Svarson

/

.N. S. Elliott

/ OAvis G59se R. J. T'-S D. f. Eall=an-

3. M. Dunn-g7 g > g ' y-g Two recent events at the Toledo site have poi = ed out giving cur cus:crers e ough guidance c that perhaps ve are the operation of the high pres-sure 1:j ee: ice sys:e=.

On Septe:ber 24, 1977, after depressuricing due to a stuck open elect ::atic relief valve, high pressure injectic catically initiated.

vas auto-

,to recover, eithout regard to primarf pressure ~he operator stopped EPI whe

.J.

~ &a8 As a result, the transie t ce:tinued on with*beiling in the RCS, etc.

In a similar cccurrence en W

Ceteber 23,_1977, the4 cperator bypassed high pressure injection to prevent initiation, eve: though reaeter cec 12::-systen pressure vent belev the

~

actuatic: point.

Since there cre accidents which require the centinuous operation of the hi h iing to our cus:c crs en when they can safely shutpressure injection s g

I recc :end the fo11ceing guidelines be sent:the systen deva felicving an accident?

a) Do not bypass c othervise preve:: the actuation of high/lov pressure 1:jection under anv conditions except a nor=al, controlled plant shu:devn. _

b)

Once high/ lev pressure injection is initiated, do not stop it unless:

Taye is s:cb.e or decreasing and pressurizer level is increasing and prir.ary presture is at least 1600 ? SIC and increasing.

I vould appreciate your thoughts on this subject.