ML19257B381

From kanterella
Jump to navigation Jump to search
Forwards LER 79-028/03L-0
Date released: 09/28/2019 Download: ML19257B381


LER 79-028/03L-0:on 791205,while Performing Reactor Core Isolation Cooling Turbine Area High Temp Calibr,Four Temp Switches Tripped in Excess of Tech Spec Limit.Caused by Instrument Setpoint Drift.Switches Recalibr
ML19257B388
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 12/31/1979
From: Kan S
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19257B388 (3)
Forwards LER 79-028/03L-0
ML19257B380
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 12/31/1979
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19257B380 (1)