ML19257B034

From kanterella
Jump to navigation Jump to search
Forwards Draft Technical Rept on BWR Control Rod Drives Mechanical Failures
ML19257B034
Person / Time
Issue date: 11/20/1978
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Knight J, Mattson R, Noonan V
Office of Nuclear Reactor Regulation
Shared Package
ML19257B035 List:
References
REF-GTECI-B-48, REF-GTECI-CR, TASK-B-48, TASK-OR NUDOCS 8001150131
Download: ML19257B034 (1)


Text

a l ht'Y Ok f' "*%,,

UNITE D a' BTES

, ' t, NUCLEAR REGULATORY COMMiss!ON

),,

,I WASHINGTON. D. C. 20555 November 20, 1978 e

MEMORANDUM FOR:

R. Mattson, DSS

~

J. Knight, DSS V. Noonan, D0R B. Grimes, 00R P. Check, D0R G. Lainas, DOR E. Jordan, I&E FROM:

D. G. Eisenhut, Deputy Director, D0R

SUBJECT:

DRAFT TECHNICAL " REPORT ON BWR CONTROL R0D DRIVES MECHANICAL FAILURES" - TASK B-48 We have previously worked with members of your staff to resolve comments on the draft technical report entitled " Report on BWR Control Rod Drives Mechanical Failures". This report summarizes CRD operating experience and includes our recent conclusions (as stated in our September 20, 1978 letter to GE). As such this report is meant to serve as documentation of the completion of Technical Activity B-48.

For ease of reference, a copy of our draft Task Action Plan is also attached.

We request your coments and/or concurrence to issue this report as a NUREG.

Please provide your coments to K. Jabbour (ext. 28414) by COB November 27, 1978.

s.

\\..

Darrell G. Eisenhut, Deputy Director Division of Operating Reactors Office of Nuclear Reactor Regulation

Attachment:

As stated cc w/ attachment:

V. Stello K. Jabbour E. Case,

t ^ c" 1750 097 8001150 13/