ML19257A730

From kanterella
Jump to navigation Jump to search
Forwards LER 79-021/01T-0
Date released: 09/28/2019 Download: ML19257A730


LER 79-021/01T-0:on 791211,during Normal Operation, Increasing Steam Generator Primary to Secondary Leakage Noted.Caused by Leaking Tube in Steam Generator B.Plugs Welded & Repaired
ML19257A731
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/22/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19257A731 (5)
Forwards LER 79-021/01T-0
ML19257A729
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/22/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19257A729 (1)