Responds to IE Bulletin 79-18.Twelve Sirens Interlocked W/ Plant Public Address Sys,W/Test of Emergency Sys on 791118. Five Areas Identified Where Siren Was Marginal in Audibility.Request for Mod Has Been Issued
ML19257A629
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/12/1979
From: Fields H
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-18, NUDOCS 8001070053
Download: ML19257A629 (1)


Text

.

7]C CORSum8fS

- Power Company

(

h D

General Offices. 212 West Mich:gan Avenue. Jackson. Michigan 49201. Area Code 517788 0550 U

December 12, 1979 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - RESPONSE TO IE BULLETIN 79-18, AUDIBILITY PROBLEMS ENCOUNTERED ON EVACUATION OF PERSONNEL FROM HIGH NOISE AREAS Consumers Power Company's response to IE Bulletin 79-18 ( Audibility Problems Encountered on Evacuation of Personnel from High-Noise Areas) is as follevs:

At Big Rock Point, a site emergency is annunciated by means of 12 sirens which are interlocked with the plant public address system. A test of this system was conducted on November 18, 1979. The plant was at 82% power with all normal plant equipment in service. The test identified five areas where ths pl:.at siren or public address system were marginal in audibility. As a result of this test, a request for modification has been issued and the marginal areas vill be updated as parts are procured. This i= expected to be ccmplete by approximately Maren 1, 1980. The five margf aal areas found in the Novetaber 18, 1979, test are listed belov.

1.

Cutside cable penetratieri tools (due to :=cently installed insulation).

2.

Fuel cask loading area (due to recently installed roll-up doors).

3.

The heating boiler room (due to high background noise).

h.

The new office trailers (recently added to site).

5 The bypass valve hydraulic pump area (due to high background noise).

When the modifications are complete, the system vill be rechecked.

Howard Fields (Signed)

[

Howard Fields Licensing Engineer

!e CC: Director, Office of Nuclear Reactor Regulation