e pa arog

+

0, UNITED STATES NUCLEAR REGULATORY COMMISSION y

>c, g

inw.wsww o e emos

. e

%*..../

DUQUESNE LIGHT COMPANY OHIO EDIS0N COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-334 BEAVER VALLEY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 22 License No. DPR-66 The Nuclear Regulatory Commission (the Commission) has founc' that:

1.

A.

The application for amendment by Duquesne Light Company, Ohio Edison Company, and Pennsylvania Power Company (the licensees) dated October 28, 1976, as supplemented October 10,1977, June 12, 1978, July 24,1978 and August 10, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, B.

the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized C.

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's reaulations; The issuance of this amendment will not be inimical to the common D.

defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part E.

51 of the Commission's regulations and all applicable requirements have been satisfied.

1687 294 0

8001040

,7

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-66 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 22, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION J,,% k'!l4W A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications December 4,1979 Date of Issuance:

1687 295 1

ATTACHMENT TO LICENSE AMENDMENT NO. 22 FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-334 Replace the following pages of the Appendix "A" Technical Specifications The revised pages are identified by Amendment with the enclosed pages.

The-number and contain vertical lines indicatina the area of change.

correspondina overleaf pages are also provided to maintain document completeness.

Paaes 1-7 3/4 0-2 3/4 0-3 (added)..

B 3/4 0-3-(added) 1687 296

I 4

TABLE 1.2 FRE00ENCY NOTATION FREOUENCY NOTATION At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

S At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

D At least once per 7 days.

W At least once per 31 days M

At least once per 92 days.

Q At least once per 184 days.

SA R

~

At least once per 18 months.

Prior to each reactor startup.

S/U Not aoplicable.

N.A.

Amendment No. 22 1-7 BEAVER VALLEY - UNIT 1 1687 297

om o

. g-J o o Ju o Ju ITO __,

_3 '4 LIMITING CONDITIONS 10R OPERATION AND_ SURV(lLLANCL RIQQl M Np 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION Limiting Conditions for Operation and ACTION requirements sh'all 3.0.1 be applicable during the OPERATIONAL MODES or other conditions specified for each specification.

Adherence to the requirements of the Limiting Condition for 3.0.2 Operation and/or associated ACTION within the specified time interval shall constitute compliance with the specification.

In the event the Limiting Condition for Operation is restored prior to expiration of the specified time interval, completion of the ACTION statement is not required.

In the event a Limiting Condition for Operation and/or associated 3.0.3 ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the specification, the facility shall be placed in at least HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and in COLD SHUTDOWN within the following 30' hours unless corrective measures are completed that permit operation under the permissible ACTION statements for the Exceptions specified time interval as measured from initial discovery.

to these requirements shall be stated in the individual specifications.

Entry into an OPERATIONAL MODE or other specified applicability 3.0.4 condition shall not be made unless the conditions of the Limiting Condition for Operation are met without reliance on provisions contained in the This provision shall not ACTION statements unless otherwise excepted.

prevent passage through OPERATIONAL MODES as required to comply with ACTION statements.

SURVEILLANCE REQUIREMENTS Surveillance Requirements shall be applicable during the OPERA-4.0.1 TIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Sur-veillance Requirement.

Each Surveillance Requirement shall be performed within the 4.0.2 specified time interval with; A maximum allowable extension not to exceed 25% of the sur-a.

veillance interval, and I ;EAVER VALLEY - UNIT 1 3/4 0-1 1687 298

APPLICABILITY SURVEILLANCE REOUIREMENTS (Continued) b.

A total maximum combined interval time for any 3 consecutive surveillance intervals not to exceed 3.25 times the specified surveillance interval.

4.0.3 Perfonnance of a Surveillance Requirement within the specified time interval shall constitute compliance with OPERABILITY requirements for a Limiting Condition for Operation and associated ACTION statements unless othemise required by the specification.

4.0.4 Entry into an OPERATIONAL MODE or other specified applicability condition shall not be made unless the Surveillance Requirement (s) associated with the Limiting Condition for Operation have been performed within the stated surveillance interval or as othemise specified.

The provisions of Specification 4.0.4 are not applicable to the perfonn-ance of surveillance activities associated with fire protection technical specifications 4.7.14 and 4.7.15 until the completion of the initial surveillance interval associated with each specification.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2 and 3 components shall be applicable as follows:

a.

Inservice inspection of ASME Code Class 1, 2 and 3 components and inservice testing of ASME Code Class 1, 2 and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Section 50.55a(g)(6)(1).

b.

Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:

ASME Boiler and Pressure Vessel Code and applicable Required frequencies Addenda terminology for for performing inservice inservice inspection and inspection and testing testino activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Yearly or annually At least once per 366 days BEAVER VALLEY - UNIT 1 3/4 0-2 knendment No. 78, 22 1687 299

/

APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued)

The provisions of Specification 4.0.2 are applicable to the c.

above required frequencies for perfoming inservice inspec-tion and testing activities.

d.

Performance of the above inservice inspection and testing activities shall be in addition to other specified Surveillance Requirements.

Nothing in the ASME Boiler and Pressure Vessel Code Shall be e.

construed to supersede the requirements of any Technical Specification.

1687 300 BEAVER VALLEY - UNIT 1 3/4 0-3 Amendment No. 22

APPLICABILITY BASES This specification ensures that inservice inspection of ASME 4.0.5 Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2 and 3 pumps and valves will be performed in accordance with a periodically updated version of Section XI of the ASME Boiler and Relief Pressure Vessel Code and Addenda as required by 10 CFR 50.55a.

from any of the above requirements has been provided in writing by the Commission and is not a part of these Technical Specifications.

This specification includes a clarification of the frequencies for performing the inservice inspection and testing activities required by Section XI of the ASME Boiler and Pressure Vessel Code and applicable This clarification is provided to ensure consistency in surveil-Addenda.

lance intervals throughout these Technical Specifications and to remove any ambiguties relative to the frequenciss for performing the required

~

inservice inspection and testing activities.

Under the terms of this specification, the more restrictive require-ments of the Technical Specifications take precedence over the ASME Boiler and Pressure Vessel Code and applicable Addenda.

For example, the requirements of Specification 4.0.4 to perform surveillance activities prior to entry into an OPERATIONAL MODE or other specified applicability condition takes precedence over the ASME Boiler and Pressure Vessel Code provision which allows pumps to be tested up to one week after return to normal operation and for example, the Technical Specification definition of OPERABLE does not grant a grace period before a device that is not capable of performing its specified functions is declared inoperable and takes precedence over the ASME Boiler and Pressure Vessel Code provision which allows a valve to be incapable of performing its specified function for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before being declared inoperable.

\\

1687 301 BEAVER VALLEY - UNIT 1 B 3/4 0-3 Amendment No. 22

.