ML19257A417
Jump to navigation
Jump to search
| ML19257A417 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/20/1979 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8001040233 | |
| Download: ML19257A417 (1) | |
Text
UNITED STATES OF AMERICA pi NUCLEAR REGULATORY COMMISSION A
COMMISSIONERS:
John F. Ahearne, Chairman Victor Gilinsky 6
ww
- Richard T. Kennedy 4
Joseph M. Hendrie Peter A. Bradford
)
In the Matter of
)
)
WISCONSIN ELECTRIC POWER COMPANY
)
Docket No. 50-266 (Point Beach Nuclear Plant, Unit 1) )
)
For Relief Under 10 CFR 2.206
)
)
ORDER Pursuant to 10 CFR 2.772, the time for the Commission to elect to review the November 30, 1979 denial of enforcement action in connection with this facility is hereby extended until January 9, 1980.
It is so ORDERED.
For the Commission n
t
!}
[% w_O SAMUEL J. CHILK Secretary of the Commission Dated at Washington, D.C.
this 2p#-day of December,1979.
1684 083 8001040