Notifies That Response to Item 3 of NRC Cannot Be Submitted 791221 & Will Instead Be Submitted Prior to Facility Restart or 790401,whichever Is First
ML19257A288
Person / Time
Site: Crane 
Issue date: 12/27/1979
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-1570, NUDOCS 8001030573
Download: ML19257A288 (1)


Text

Metropolitan Edison Company Post Office Box 480 g

Middletown, Pennsytvania 17057 717 944-4041 wnter's Direct Dial Number December 27, 1979 GQL 1570 Director of Nuclear Regulatory Regulation Atta:

R. W. Reid, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit I (TMI-1)

Docket No. 50-289 License No. DPR-50 Degraded Grid Voltage In our response (letter GQL 1470 December 10,1979) to your letter of August 14, 1979, we did not include the response to item 3 but stated that the response would be completed by December 21, 1979. However, following the submittal of our response (GQL 1470), a telephone conference call was held between NRC, Met-Ed and GPU.

As a result of this telephone call the induction motor undervoltage relays will be replaced with solid state relays. These relays will be installed prior to restart.

Since the information requested in item 3 depends upon the relay design, this information cannot be provided by December 21, 1979 as anticipated. Consequently, the response to item 3 will be submitted prior to the restart of TMI-I or April 1,1980, whichever is sooner.

Sincerely, J. G. Herbein Vice President Nuclear Operations JGH:DWR: hah 1667 32f i0

\\