Forwards Proposed Change 73-1 to Tech Specs to Allow Continued Power Operation During Cycle 5.Cycle 5,Core Performance Analysis Encl
ML19257A269
Person / Time
Site: Maine Yankee
Issue date: 12/05/1979
From: Johnson W
Maine Yankee
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19257A270 List:
References
WMY-79-143, NUDOCS 8001030497
Download: ML19257A269 (2)


Text

' :.,

mal #E

  1. A##EE ?

/ 4:7 0 CE

  • TURNPt KE ROAD (RT. 9)

$ J'

[

ENGINEERING OFFICE WESTBOR O, MASSACHUS ETTS 01581 617-366-9011

. m$

Proposed Change #73-1 B.3.2.1 WMY 79-143 December 5, 1979 United States Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Office of Nuclear Reactor Regulation

Reference:

License No. DPR-36 (Docket No. 50-309)

Dear Sir:

Pursuant to Section 50.59 of the Commission's Rules and Regulations Yankee Atomic Electric Company hereby proposes the following modification to Appendix A to the Technical Specifications.

PROPOSED CHANGE: Reference is made to the Technical Specifications contained in Appendix A to the Operating License No. DPR-36 issued to Maine Yankee Atomic Power Company for the Maine Yankee plant. We propose to modify these specifications as follows:

A.

Replace pages 2.1-1, 2.1-4, 2.1-5, and 2.1-6 of Specification 2.1 with the attached revised pages 2.1-1, 2.1-4, 2.1-5, and 2.1-6.

B.

Replace pages 3.10-1, 3.10-2, 3.10-3, and 3.10-4 of Specification 3.10 with the attached revised pages 3.10-1, 3.10-2, 3.10-3, and 3.10-4.

C.

Replace Figures 3.10-2, 3.10-3, 3.10-4, and 3.10-5 of Specification 3.10 with the attached revised Figures 3.10-2, 3.10-3, 3.10-4, and 3.10-5.

D.

Replace page 3.15-1 with attached revised page 3.15-1.

REASON FOR CHANGE: We propose to refuel the Maine Yankee reactor to allow continued power operation during the next cycle (Cycle 5).

This refueling will involve the discharge of 73 fuel assemblies and the insertion of 72 new assemblies.

In addition, one (1) once burned fuel assembly is being reinserted from Core 2.

This submittal addresses those changes that are necessary as a result of this refueling operation.

SASIS FOR CHANGE: Attachment A provides a description and justification for each change noted above. The attached report, YAEC-1202, provides the Core Performance Analysis Report in support of Maine Yankee Cycle 5 operation.

This report addresses the mechanical design, thermal-hydraulic design, physics and safety analysis aspects of the refueling.

1668 254

'/ D 8001030

United States Nuclear Regulatory Comission December 5, 1979 Office of Nuclear Reactor Regulation Proposed Change #73 Page Two SAFETY CONSIDERATIONS: Based on the considerations contained herein, it is concluded that there is reasonable assurance that operation of the Paine Yankee plant consistent with the proposed Technical Specifications will not endanger the health and safety of the public.

This proposed change has been reviewed by the Nuclear Safety Audit and Review Committee.

FEE DETERMINATION: This proposed change requires an approval that involves a single safety issue and is deemed not to involv.e a significant hazards cos.31deration. For these reasons, Maine Yankee Atomic Power Company proposes this change as a Class III Amendment. A payment of $4,000.00 is enclosed.

SCHEDULE OF CHANGE: These changes to the Maine Yankee Technical Specifications will be implemented upon Commiscion approval. A timely review and approval of this submittal consistent with our schedule for Cycic 5 startup would be appreciated. Cycle 5 is scheduled to commence on or about March 1, 1980.

We trust that you will find this submittal satisfactory; however, should you desire a dditional information, feel free to contact us.

Respectfully submitted, MAINE YANKEE ATOMIC POWER COMPANY Q

r,9 i yhl / V l! tic]j W.

P,. Johnson Vice President Commonwealth of Massachusetts)

)ss.

County of Worcester

)

Then personally appeared before me, W. P. Johnson, who being duly sworn, did state that he is Vice President of Maine Yankee Atomic Power Company and that he is duly authorized to execute and file the foregoing amendment in the name, and on the behalf of Maine Yankee Atomic Power Company, and that the statements in said application are true to the best of his knowledge and belief.

Robert H. Groce'

' Notary Public g,,..... "....,

H.

My Commission Expirer, September 14, 1984

,.pT

~ e.s %,

t '

'*'J br].4 1668 255

%$e t,D,t r ?[