ML19257A131

From kanterella
Jump to navigation Jump to search
Notification of 791214 Meeting W/Util in Bethesda,Md to Discuss Valve Monitoring Program
ML19257A131
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/10/1979
From: Verrelli D
Office of Nuclear Reactor Regulation
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 8001020134
Download: ML19257A131 (2)


Text

oen arc,,%

'[,

UNITED STATES j

="

-1 NUCLEAR REGULATORY COMMISSION

.I WASHINGTON, D. C. 20555

'%,9 Y /

S

,],-

December 10, 1979 Docket Nos. 50-277 and 50-27E 9

MEMORAtOUM FC+R: Thomas A. Ippolito, Chief, ORB #3, 00R 2

FROM:

David M. Verrelli, L

SUBJECT:

FORTHCOMING MEETING WITH PHILADELPHIA ELECTRIC COMPANY -

Valve Monitoring Program at Peach Bottom Unit Nos. 2 and 3 Time ar.d Date:

10:30 A.M., December 14, 1979 Locatica:

P-118 Bethesda, Maryland Summary:

Philadelphia Electric Company (PECo) is considering the implementation of a man-machine interfaced vai.e monitor-ing program at Peach Bottom Nuclear Power Station. The purpose of the program is to pro, vide timely dis-play of valve positions and to pro-vide mechanized audit of operator actions in order to eliminate errors.

PECo engineers will provide a description of the system to the staff and will solicit coments or suggest, ions.

/

, { ph u-&t,+

~

Dav d M. Ve elli, Team Leader s

GE WR Impi mentation Group 1665 303

[

8001020

MEETING NOTICE DISTRIBUTION Docket Files NRC PDR Local PDR ORBf3 Rdg NRR Rdg HDenton ECase DEisenhut WGamill BGrimes RVollmer LShao JMiller TIppolito RReid VNoonan GKnighton DZiemann ASchwencer DCrutchfield PCheck Glainas RClark FPagano NHa31er a

OELD OI&E (3)

OSD (3)

CThayer Receptionist ACRS (16)

NRC Participants SSheppard Project Manager g

3 I

TERA Yer~relli TNovak CNelson CLong J01shinski TTelford s

-