ML19256G520

From kanterella
Jump to navigation Jump to search
Forwards LER 79-100/03L-0
Date released: 09/27/2019 Download: ML19256G520


LER 79-100/03L-0:on 791211,during Steady State Power Operation,Lpci Containment Isolation Valve E11-F015B Determined to Be Leaking.Caused by Valve Seat Being Galled. Corrective Action Not Complete
ML19256G521
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/19/1979
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256G521 (3)
Forwards LER 79-100/03L-0
ML19256G519
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/20/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19256G519 (1)