ML19256G506

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Rept for Nov 1979
ML19256G506
Person / Time
Site: Pilgrim
Issue date: 12/21/1979
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19256G507 List:
References
79-273, NUDOCS 7912310413
Download: ML19256G506 (1)


Text

.

December 21, 1979 BECo Ltr. #79-273 Director Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commissien Washington, D.C.

20555

Subject:

REVISED November, 1979 >bnthly Report Docket No. 50-293 License DPR-35

Dear Sir:

In accordance with Pilgrim Nuclear Power St.ation Technical Specification 6.9.A.2, a revised copy of the Refueling Information Section of the Opera-tional Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

This revision changes Part 6 of the Refueling Information Section to include updated information received af ter the Monthly Report was published.

Respe tfully submitted, 4j

$p-. N-P. J. McGuire Station Manager Nuclear Operations CMG:ep cc: Director (1 copy)

Of fice of Inspection and Enforcement Of fice of Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Director of Region I (1 copy)

Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 1656 335

_ cog s

///

h 7912310 Q\\3