Summary of 791026 Meeting W/Bechtel,Usgs & Util in Bethesda, MD Re New USGS Data Which Could Revise Evaluation of Geology & Seismology Re High Angle Faults Not Previously Considered for Potential High Energy Generators
ML19256G335
Person / Time
Site: Skagit
Issue date: 12/05/1979
From: Peltier I
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7912310080
Download: ML19256G335 (4)


Text

DEC 5 1979 MEETING

SUMMARY

DISTRIBUTION LWR-1 Docket File NRC Participants NRC PDR Appropriate IE Regional Offices Local PDR TIC NRR Reading LWR 1 File H. Denton E. G. Case H. Berkow D. Ross D. Vassallo J. Stolz R. Baer Caseload Forecast Panel Meetings Only

0. Parr L. Rubenstein J. Rothfleisch S. Varga T. Abell C. Heltemes G. Matthews L. Crocker W. Lovelace B. Kirschner S. Boyd F. Williams H. Berkow R. Mattson L. Schaub R. DeYoung Trip Participants Project Manager Attorney, ELD E. Hylton IE (3)

ACRS (16)

R. Denise 1660 345 7o12s10

y[

Io UNITED STATES g

3 o

NUCLEAR REGULATORY COMMISSION h

WASHING TON. D. C. 20555

% * * * * *,e DEC 5 1979 Docket Nos. 50-522/523 APPLICANT: Puget Sound Power and Light Company FACILITY:

Skagit Nuclear Power Project

SUBJECT:

DISCUSSION OF GE0 LOGY OF PROPOSED SKAGIT SITE - OCTOBER 26, 1979 BACKGROUND On October 17, 1979, the USGS submitted its final status report to the NRC staff regarding its review of the proposed site for the Skagit Nuclear Power Project with respect to seismology and geology important to the design basis for the project. On October 2,1979, the staff completed its review and safety evaluation of the proposed site.

However, on October 10, 1979, the USGS notified the staff that information and data had come to its attention which would result in the USGS not being able to support the conclusions of its report to the staff.

The staff met with the USGS on October 18, 1979 and as a result concluded that it would take the staff some additional time to evaluate the data and information presented by the USGS.

The purpose of this October 26, 1979 meeting at Bethesda was to discuss the data and information with Puget Sound Power and Light Company.

Meeting participants are listed in the enclosure.

SUMMARY

During the working meeting the USGS presented the data and information which could result in a revised interpretation of the geology and seismology, partic-ularly with regard to high angle faults previously considered not to be potential high energy generators and therefore not controlling for the design basis of the project.

No conclusions were reached at the meeting nor were there any positions taken by the staff. However, consistent with the applicar.t's burden to provide necessary information for the staff's review, the staff indicated that new questions of the applicant would be formulated by the USGS/NRC in the near future.

The applicant's responses to the questions will be evaluated by the staff prior to issuance of a final SEP.

I.

. Peltier, Project Manager Light Water Reactors Branch No. 1 Division of Project Management 1660 346

Enclosure:

Attendance List cc: See next page

f tr. J. E. Mecca fir. J. E. Mecca, Manager V. B. Deale. Esa., Chairman Nuclear Licensing ard Safety Atomic Safety & Licensing Board Puget Sound Power & L ight Company V. S. Nuclear Regulatory Camnssion Puget Power Building Washington, D. C.

20555 Bellevue, Washington 98009 Dr. Frank F. Hooper, Member cc: Mr. F. Theodore Thomsen Atomic Safety & Licensig Board Perkins, Cole, Stone, School of Natural Resources Olsen & Williams University of Michigan 1900 Washington Building Ann Arbor, Michigan 48109 Seattle, Washington 98101 Mr. Gustave A. Linenberger, Member Mr. Robert Lowenstein Atomic Safety & Licensing Board

~

Lowenstein, Newman, Reis U. S. Nuclear Regulatory Coninission

& Axelrad Washington, D. C.

20555 Suite 1214 1025 Connecticut Avenue, N. W.

Tho' ras F. Carr, Esq.

Washington, D.C.

20036 Assistant Attorney General Temple of Justice Roger M. Leed, Esq.

Olympia, Washington 98504 Law Offices lall ath Avenue Seattle, Washington 98104 Mr. Lloyd K. Marbet c/o Forelaws on Board 19142 South Bakers ferry Road D

fl D

Boring, Oregon 97009

}

i Mr. Nicholas D. Lewis, Chairman Ener9y Facility Site Evaluation Council 820 East 5th Avenue Olympia, Washington 98504 Honorable Richard Sandvik Department of Justice 500 Pacific Building 520 Southwest Yamhill 1660 347 Portland, Oregon 97204

OCTOBER 26, 1979 MEETING PARTICIPANTS NRC BECHTEL Irving A. Peltier Lon Stoker J. P. Knight M. J. Adair R. L. Black T. W. Godoy H. E. Lefevre R. H. Talmage S. L. Wastler Milton B. Dobrin (Univ. of Houston /Bechtel)

R. P. Denise R. Jackson D. Swanson Paul Leech USGS PUGET Robert H. Morris J. E. Mecca Holly C. Wagner G. W. Jacobsen H. W. Coulter D. S. Little J. F. Devine Howard A. Coombo (Consultant-Puget)

Joseph A. Vance (Consultant-Puget)