Forwards Response to IE Bulletin 79-18, Audibility Problems Encountered on Evacuation of Personnel from High Noise Areas. Audibility Check of Plant Emergency Evacuation Alarm Revealed Numerous Areas Where Alarm Could Not Be Heard
ML19256G310
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/12/1979
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
791213, IEB-79-18, NUDOCS 7912310015
Download: ML19256G310 (2)


Text

Alabama Power Company e

600 North 18th Street Post Office Box 2641

.I

/d Birmingham. Alabama 35291 Telephone 205 323-5341 g#'Ad Y

~.O

+ .

F. L. CLAYTON, JR.

Senior Vice President AlabamaPower n3  % southem ekcrc sprem

_ ,g . c. u . ,3 Decenter 12, 1979 I:ocket 50-364 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Ctmnission Region II 101 Marietta Street, N. W.

Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

In response to IE Bulletin 79-18, Antiihility Problerns Encountered on Evacuation of Personnel Frtrn High-Noise Areas, Alabama Power Oxnpany subnits the attached.

Yours very truly,

.L'An g F.L.fDCL Clayto Jr.

FICjr/HRF/mnb AttachmenL cc: Mr. R. A. 'Ihamas Mr. G. F. Trowbridge Office of I&E-Divn. of 'ctor Operations Inspection Washington, D. C.

en

~

1660 236 g ,a.x. x.c

'I91231 o O/(

ATTA0 BENT FNP, thit 1, war, in an extended refueling outage until Novmber 21, 1979. Between Novmoer 22 and Deceber 7,1979, plant personnel performed an audible check of the Plant Emergency Evacuation Alarm.

The containment was checked while the unit was in node 3. The Auxiliary Building and rest of the plant site was checked while the unit was in mode 1. 'Ihe check of the Plant Emergency Evacuation Alarm revealed numerous areas in contaiment and throughout the plant site where the alarm could not be heard by plant personnel.

Visual Plant Emergency Evacuation Alarm Systmis are not installed at FNP. The Plant Dmrgency Evacuation Alarm is carried over the Public Address Systs.

Alabana Power Ompany will implement design correction measures on an expedited basis. Implementation will begin as soon as design and materials are available. Inaccessible areas will be corrected at the first refueling outage following receipt of design and materials (anticipated to be October 1980) .