s h"') SACRAMENTO MU' PAL UTILITY DISTRICT O 62 SMUD 95813; (916) 452-3211 December 13, 1979 Director of Nuclear Reactor Regulation ATTN:
Robert W.
Reid, Chief Branch No. 4 Division of Operating Reactors U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Reid:
Re:
Docket No. 50-312 Rancho Seco Nuclear Generating Station Your letter of October 23, 1979, requested the District to (1) inform you of our commitment to operate in accordance with your interim position for containment purge and valve operation, and (2) provide information which demonstrates that we have initiated the purge and vent valve ope.rability verification on an expedited basis.
The District responded to interim restrictions on purging and venting January 4, 1979 and June 15, 1979.
Following telephone conversations between responsible staff members, mutual agreement was reached on an aceptable maximum amount of purging and venting.
The District's position is, and has been, to limit the pu ging and vent-ing to as low as possible, consistent with those guide-lines.
The District will fperate the cont.tinment purge and vent in as passive a m6de as possible.
It should be reiterated that modi fications to containment isolation Cignals are unnecesrary.
Containment isolation is independent and uninhibited by other perge or vent control.
In our letter of November 9, 197) to Mr.
D.
G.
Eisenhut, Acting Director, Division of Operating Reactors, the District committed to participate in the Allis-Chalmers Corporation valve operability verification program. At-tached to this letter is a copy of a billing authorization issued to Allis-Chalmers Corporation for participation in their valve qualification program.
This billing authorization 73,\\ c3
/b>34 1624 JM 5
ili 7912190 55.3 AN E L E C T 11 C" S Y S T E M S E 9 VI N J MORE THAN G C00 IN THE HEART Of C A ll F 0 R N i A
Mr. Robert W. Reid December 13, 1979 demonstrates that the District has initiated action to qualify the operability of the containment vent and purge valves on its Rancho Seco Nuclear Generating Station.
Should you have any questions, please contact Mr. Larry Smith at 916-452-3211.
Sincerely ours O
~.
Wm. C. Walbridge General Manager Encl.
1624 6
,, \\ \\
-e.
=
..a.
e SILLING A U T H O R I Z AT I O N 4 GME3 '
SACRAMENTO MUNICIPAL UTILITY oisTRICT O 62o1 S Street. Don 1583o, sacramento, California 95813; (916) 452 3211 To Allis Chalmers oot.
December 3, 1979 Dox M-93 York, Pennsylvania, 17405 Ar.. 025 oti'nbru 60790 R.r.r.ac. Attached letters Datpd 10/19/79 and 11/21/79 Authorizofien is hereby given to perform the fo!!owing described work for the account of the act fnento Municir I (ilitysDistrict.
Authorization terminates one year from date unless otherwise specified hereon.
Maximum Billing is Not To Execed $ 5000.00 Appecued:
j,,
, y, Issued by L. Smith renfirming Wm. C. Walbridge
//
orrangements with Ftank J. Anderson General Manager Descriplien of werk 1.
One set of Test Reports as described in the Allis-Chalmers letter of 10/19/79 (copy attached)'.
2.
A statement relating to our valves, in containment isolation, furnished by Allis-Charmers, to the applicable fRC considerations in Guidelines for Demonstration of Operability of Purge and Vent Valves.
D""
D '9~
b.-
00 o
/
n Requestad by L. Smith Job t.ocation Rancho Seco vrnnor< cooc FOR ACCOUrJTif.'G USE OfJt.Y (9 - 1 31 AREA Ol5T n t F4U TIO N h
L DESCRIPTION AMOUNT p_J 39 8 4 4t i c 7 4 3 44 9:5 4f,.37.18 19t*0 (S '. S S) 14 15 16:27:15819'*0 L? ! ?2 23:24 2516 77;28129! 0'31 3733 34 35,.36 37 (65-749 3
l'
-l l l
I l
l 1
I l
e DAIL i AMOUNT DISCOUNT Ol'5C n t P1 t O N p,.O g D A 14 3 5f 3 6111 18119'2 0 01'22 23.2 4.25 t26 27 2R c9 30 3 t L32'33:34.35136 37 33 loi40 41 (6%. 741
_ 75 e01
(
II l
l l
I' j
l l
i f
UILLif43 APPetOVAL AAMOUNT SLRVICLh VLHit ILU~h Y N'
- A N?
3262
$ MUD-ol43 3/77
xo O
O 4.0EW O tl0V26GI9
$ ALLIS-CMALMERS cgedienE:d**B DOX M-93 e YORK. PENNSYLVANIA 17405, 71/ 848 1126 VORit PLANT VALVE Dtvl$ SON Novesber 21, 1979 Sacramento Municipal Utility District 6201 S. Street P.O. Box 15830 Sacramento, CA 95813 ATTENTION:
Mr. Larry Smith
SUBJECT:
NASA Test Gentlemen:
As outlined in our letter of 10/19/79 we have completed the tests at NASA Facilities in Langley Field, Virginia.
The test results are of significant importance relative to
' choke flow', or discharge-to-atmosphere condition.
Within six weeks the test report will be completed and available to you.
During the testing we used sufficient models and line simu-lation so that we can calculate the actual torque conditions, for your specific installation, based on the pertinent gunstions posed by the MRC.
The cost of a test report, including a statement relating your valve installation to the test and to the recent NRC questions is $4,287.00.
Please include in your purchase order as follows:
1.
One set of test reports as described in the Allis-Chalmers letter of 10/19/79.
2.
A statement relating our valves, in containment isolation, furnished by Allis-Chalmers, to the applicable UnC considerations in Guidelines for Demonstration of Operability of Purge and Vent Valves.
g(3 Thanking you in advance for your cooperaticn.
I am,
)0h Y
g g
D
' 3 T'
Ao o
L s
Frank J.
Anderson J#
Power Market Manager A L L i S e C et A L M r. R S CORPOftAT1ON a
e;
..;~.I.~T..~........--_.---....---4--
//hDJ, f:
?i N<
Mtd -da6nm '
ALLIS-CI!ALMERS.ox pr. vo. n suv.. n./m nn
@ j,,.
yc c /
-q{.9 M 43
&~
g[,0 g
vo,ncrLaur oI U van.vc omsson
('M 3
C "'
October 19, 1979
/
Sacramento Municipal Utility . strict 6201 S. Street P.O. Box 15830 Sacramento, CA 95813 Attn:
T. J. Labhard Gentlemen:
As we are all aware, the Nuclear Regulatory Commission is in the process of reviewing the various safety-related (NRC) not the 1 cast of which components within a nuclear power plant, are the containment isolation valves.
With this in mind, we are writing at this time to advise you of an opportunity to participate in a testing program (3) weeks.
Said test which will occur in approximately three will be conducted at NASA Langley Research Center in Virginia, The cost for participating with A-C bearing 50% of the test cost.
utilitics will be in the range of $3000 to $5000 with a firm price being offered prior to the actual issuance of test reports.
For your consideration, attached please find the test It is our. belief that.th_is procedure which is to be followed.
,c.st,and.the resultant report will_ satisfy those._ areas o_f t
and will'be an. invaluable addition to concern of the H.R.C., Your concurrence with this belief can
'your nuclear records.be demonstrated by acknowledging your participation andrelat cost sharing on or prior to November 1, 1979.
If we may be of any additional assistance, please advise this office.
I am Thanking you in advance for your cooperation, Very rulv yours, t of G f yg
.. :. r w M ( g 7,_ g g _ f q c X
L C'1Tt V. va O nt u t i/9 her Power Market Manger g7 4g 6oC t
lent g
(
CCNIl$1 1624 28 7 ALLIS.CH ALMC R $ CORPOR AT GON
. -