OPERATING DATA REPORT -

DOCKET NO. 50-244 DATE December 11, 1979 COMPLETED BY bM .W'4 C w Andrew E. McNamara TELEPHONE 1-716-546-2700 OPERAMG STATUS Ext. 291-205, at Ginna

1. Unit Name: GINNA STATION. UNIT #1 N The Reactor Power
2. Reporting Period: November, 1979 Level averaged 100%
3. Licensed Thermal Power (MWr): 1520 490 hr the W-o@ d
4. Nameplate Rating (Gross MWe): the Report Period.
5. Design Electrical Rating (Net MWe): 470 The exceptions were
6. Maximum Dependable Capacity (Gross MWe): 490 the two power reduc-470 tions reported.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr. to-Date Cumulative

11. Hours In Reporting Period 720 8,016 87.768
12. Number of Hours Reactor Was Critical 720 6,137.65 67,340.07
13. Reactor Reserve Shutdown Hours 0 32.60 1,579.11 *
14. Hours Generator On-Line 720 6,050.50 65,629.13 0 0 8.5 *
15. Unit Reserve Shutdown Hours 1,059,936 8,859,744 87,.789,658
16. Gross Therinal Energy Generated (MWH) 348,950 2,952,741 28,525,981
17. Gross Electrical Energy Generated (MWH) 332,022 2,808,428 27,009,% 6
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100% 75.48% 74.78%
20. Unit Availability Factor 100% 75.48% 74.79%
21. Unit Capacity Factor (Using MDC Net) 98.12% 74.54% 67.96%
22. Uair Capacity Factor (Using DER Net) 98.12% 74.54% 67.96%
23. Unit Forced Outage Rate 0% 0.37% 9.44%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shur Down At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • Cumulative total commencing January 1, 1975 . . . . . . a a v. um 1608 063 o gg Mi

~

AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50-244 UNIT #1. Ginna Station DATE December 11. 1975 COMPLETED BY Andrew E. McNamark TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna OMER, M79 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-N et) (MWe. Net) 1

'79 475 17 2 478 18 474 3

'77 475 13 4 477 20 474

'77 47' 5 21 6

'77 475 22 7

477 474 23 g 477 318 24

, g 477 25 '71 10 227 '

26 ig 473 473 27 12 477 28 474 13 477 29 475 14 477 475 30

'8 ---

15 31 475 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

" ~ " " " ' " " '

1608 064

D(M'EliT NO. 50-244 _ _ ___,_ _

IINIT NAhlE ._81 Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATF Deceml> r li p 1979. _ _ _ _ .

COhiPLETED 14Y __ f- _ _ h Andrew E. McNamar HliPORT hlONTil NOVDfBFR . 1979 Tlil.liPilONE l-716-546-2700 Ext. 291-205, at Cinna m

Eq

}yt ,*

- o Licensee $a c

s, Cause & Corrective No. Da te

{ jj Event *4

, ij Action to e- gz g 2

;f, , Report # #j !u Prevent Recurrence g U o

i 11-10-79 F 0 A 4 IIB (llTEXCll) "B" Steam Generator llandhole Gasket Leak (Reactor maintained critical at ~20% power level).

2 11-24-79 F 0 A 4 IIB (llTEXCll) "B" Steam Generator llandhole Casket Leak (Reactor maintained critical at ~20% power level) .

Ch O

I 2 3 4 o F: Forec l Heason: hiet hml; S: Sc he luteil lishibie G - Instructions g A-Equipment Failure (limplain) 14fanual for Preparation of Data g Il4faintenance or Tess 24fanual Scram. linary Sheces for 1.icensee C-Hefueling 3-Automatic Scram. Event Report (LER) File (NilREG-D-Hegulatory Hesariction 4-Other (Explain) 0161) li-Operator Training & l.icense Examination F-A.f minis tra tive G-Operational Error (limplain) 5 E

.. .. na v. in ni ll-Other (limplain) Exhibis 1 - Same Source *

. 4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.90-244 UNIT Ginna Station. Unit #1 DATE December 11. 1979 COMPLETED BY .

D% b Andrew E. McNamara TELEPHONE 1-716-546-2700 MONTH NOVEMBER. 1979 The Reactor Power Level averaged 100% in the Report Period with exceptions as follows: Two reductions of short durations to 9 20% power level on 11/10 and 11/24, to repair a leaking handhole on the "B" Steam Generator.

1608 066 49123 rt/7tp

e .

CINNA STATION MALNTENANCE REPORT FOR NOVEMBER, 1979 During November, normal inspections and minor maintenance was performed.

Major safety related maintenance included:

1. Furmaniting a leak on the "B" Steam Generator Handhole twice.
2. Rewinding of the Limitorque motor for one of the Standby Auxiliary Feedwater Pumps Crosstie Valves.
3. Replacement of the isolation amplifier on power range channel N-44.
4. Replacement of the containment isolation reset button and containment ventilation isolation reset button with a new style key operated button.

1601B 067