Responds to NRC Re Violations Noted in IE Insp Rept 50-358/79-28.Corrective Actions:Const Debris Removed, Area Will Be Cleaned Weekly,Design Review Made Re Floor Covering & Surveillance by Qa/Qc Personnel of Cables
ML19256F153
Person / Time
Site: Zimmer
Issue date: 10/19/1979
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19256F150 List:
References
QA-1220, NUDOCS 7911210547
Download: ML19256F153 (2)


Text

5% :

{

ntn u!1 ( ~

THE CINCINNATI GAS & ELECTRIC COMPANY es F CIN CIN N ATI. OHIO 4 5 2 01 y cc pa s og October 19, 1979 QA-1220 Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT I IE INSPECTION REPORT NO. 79-28, DOCKET N0.

50-358, CONSTRUCTION PERMIT N0. CPPR-88, W.0. #57300-957, JOB E-5590 Gentlemen :

This letter constitutes our formal reply to the subject inspection report.

It is our opinion that nothing in the report or in this letter is of a proprietary nature.

The following is our response to the items of noncompliance identified in Appendix "A" of the report.

Item la.

Cleanliness of Floor Above Switchgear Room a.

Corrective Action Taken and Results Achieved The miscellaneous construction debris has been cleaned up and will continue to be cleaned on a once a week basis in this area.

b.

Corrective Action Taken to Avoid Further Noncompliance Action has been taken by the Constructor in meetings with the Architect-Engineer to have a design review made concern-ing the Zonolite floor covering in this area.

At the present, it is believed that the Zonolite can be removed completely and/or a sealer applied that would contain the Zonolite.

The Constructor is prepared to take action based on directions from the Architect-Engineer.

c.

Date When Full Compliance Will Be Achieved lj[/

374 It is anticipated that the corrective action can be completed OCT 261979 7 9,1 n o gtj 7

Mr. Gaston Fiorelli, U. S. Nuclear Regulatory Conmission Region III October 19,1979 - QA-1220 Page 2 by November 15, 1979 based on receipt of directions from the Architect-Engineer.

Item lb, Protection of Cables During Welding a.

_ Corrective Action Taken and Results Achieved The Electrical Contractor's General Superintendent has taken action by advising the superintendents and foremen under his jurisdiction to assure the proper protection of surrounding equipment and safety-related cables during the performance of any welding.

b.

Corrective Action Taken to Avoid Further Noncompliance Corrective action to avoid further noncompliance shall be surveillance by the Constructor's QA/QC personnel.

The HVAC contractor is completing his work in this area; however, action was taken by means of written instructions, to caution the HVAC contractor's craftsmen regarding welding protection.

c.

Date When Full Compliance Will Be Achieved This item is considered to be in compliance as of the date of this letter.

We trust that the above will constitute an acceptable response to the subject Inspection Report.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By D- ~

E. A. BORGMANN SENIOR VICE PRESIDENT JFW:pa 15 i

>.ts