1 VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-10 FOR THE MONTH OF OCTOBER, 1979 1380 113 7 911210 3AA
q OPERATING DATA REPORT DOCKET NO. 50-271 DATE 791113 C051PLETED BY R. M. Sjogren TELEPHONE 617) 360-9011 X2281 OPERATING STATUS
- l. Unit Name:
Vermont Yankee Notes
- time change during report period.
October 1979
- 2. Reporting Period:
- 3. Licensed Thermal Power (5 twt):
1,593 540
- 4. Nameplate Rating (Gruss SIWE):
- 5. Design Electrical Rating (Net SIWE): 514 (open evele) 504 (closed cycle) 535
- 6. 51aximum Dependable Capacity (Gross SIWE):
514
- 7. Sf aximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net 51We):
- 10. Reasons For Restrictions.lf Any:
This Slonth Yr.-to-Date Cumulative
- 745 7,296
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
.25 5,851.56 49,741.39
- 13. Reactor Resene Shutdowa Hours 0.0 0.0 0.0.
- 14. Hours Generator On-Line 0.0 5,814.78 47,947.78
- 15. Unit Resene Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Gene:ated (51WH) 0.0 8.7i8,691.5 67,145,510 (noteibelow
- 17. Gross Electrical Energy Generated (NIWH)
- 0. 0_,
2,919,694 22,259,162
- 18. Net E!ectrical Energy Generated (SIWH) 0.0 2,766,874 21,086,397
- 19. Unit Senice Factor 0.0 79.7 76.9
- 20. Unit Availability Factor 0.0 79.7 76.9 0.0 75.2 67.1
- 21. Unit Capacity Factor (Using SIDC Net) 0.0 73.8 65.8
- 22. Unit Capacity Factor (Using DER Net) 0.0 1.7 6.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Schedulet' Over Next 6 Slonths (Type. Date and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved IN111A L CRITICA LITY INITIA L ELECTRICITY CONISIERCIAL OPERATION
))hO l)k F/77)
NOTE: Corrected for cumulative error
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-271 UNIT Vermont Yankee DATE 791113 R. M. Sjogren COMPLETED BY (617) 366-9011 TELEPHONE X2281 October 1979 MONTII DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(51We-Net) 1 0.0 g7 0.0 0.0 2
0.0 gg 0.0 3
0.0 39 0.0 4
0.0 20 0.0 5
0.0 2g 0.0 6
0.0 2,
(
7 0.0 23 0.0 8
0.0 24 0.0 0.0 9
0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0.0 12 0.0 28 0.0 13 0.0 29 14 0.0 0.0 30 15 0.0 0.0 3;
16 0.0 INSTRUCTIONS On this format. list the average daily unit power lesel in MWe-Net for each day ia the reporting month. Compute to the nearest whole megawatt.
I"IIII V
P I
s 7
/
S. :
9 N
1 1
.o 7
)
1 SF 7
D c
o hr et
{
tl e 7
od el 9
0 t
l 9
D 2
2 t
D a
e
{
2
[Dr k
l G1F.DCl AI S
"g o -
l l
t 4a e
OOAORtl 1 E he mcg l iaq s tp t
p e e t
u o
unin se i i ul l etp a
a e
t nt a x nt nnm 7
$32e i iot i c
IEo'r ni g 4
a e
.i a Ty 5
3ge_
nn pl t ia t r cte i
I. v R
F anieme oa
) s is fil o
nt (1
&ci Tu r
r g
r C
5 ;: g.c e e t
s i
t(
o E
x Ln i
x pl c
p e
l j j, 5 ii n a
n
)
e ni Y
d U
s i g s _.
)
n N
6g 5X2q E
I x
T a
m S
i R
i l
na E
O t
P T
i N
R L
O D
o A
i n
e E c, R
O p v e roe n T
W n
t t
s h
N e
l e
S ON A
T h
3 D
f i
l P
O O
4 371 N c_
c R
N W
. i OA 4het C
t 0?o' t
o E
t ua1 t a h ht nno b
R e o t
e R
mlu u t.
r a a :
r E
(
a l
F Et S D
xic U
1 9
U
} 9. g c_
c pl Sa L
E r
7 C
ai c i X
O3 o*
nr,n 9
T I
)ia X
O
.n N
S NA 5
4 CO P
C N
r 1:
0EEfE e
a T!
D o
P U O s
1 vn x
v u
E r
e s
L N
i 6e i Pi nae L
h n
t y i
i t P T TI C ib 1 nt i b t
i &
E
)
E K
e E
t I S i
t ioC lie e ha e
D N T t
p i
pe r G c no 0 D A A L
hN S
ot t
ut r e a NI Tl r
r oe a
r on e
ct EYEE.O m
t s i I r
fnst c
i X
(
R7 V5
(
n o
r v
e Lr o
S lE u
e e
3( e 0
i 2
0 Lf c o
t cDti 2
1 1
r ru
)
1 m
2 M.
e a o 8
7 c
Fnt n 1
)
1 o
7 a
e is s
3 n
1 l e e
3 S
t e
(
6 j
N 6 o Y
lU
- g a
9 r n
t E
0 e k
1 n
e G.
1 e
MOO C
C*
DOCKET NO.
N sn_971 UNIT Vermont Yankee
]
DATE 791113
.m October, 1979 COMPLETED BY R. M. Sj'ogren TELEPHONE (617) 366-9011 Azzal SAFETY RELATED MAINTENANCE Page 1 of 4 NATUltli OF LiiR OR OUTAGE MALFUNCTION EQUIP?ti!NT MAINTENANCE NUMBER CAUSE ltLSU LT CORRECTIVE ACTION "B" Emergency Diesel Corrective NA Vibration Broken Studs on Replaced Studs Generator MR79-084 Vertical Drive Cover Refuel Platform Track Corrective LER Uneven Operating Erroneous Operation Replaced with Different Switches for " Platform MR79-280 79-10/3L Surface Style Actuating Arm Over Core" See Note #1 "B" Emergency Diesel Corrective NA Normal Operation Low Governor Oil Added Oil Generator MR79-516 Level IRM - D Corrective NA Failed Detector Erratic Operation Replaced Detector MR79-601 IRM - B Corrective NA Failed Detector Erratic Operation Replaced Detector MR79-602 IRM - A Corrective NA Defective Penetra-Inoperable Replaced Plug MR79-617 tion Plug "B" Emergency Diesel Corrective NA Vibration Cooling Water Line Replaced Gasket MR79-647 Leak Recirc Suction Valve Corrective NA Normal Wear Leakage Repacked Valve V2 - 43B MR79-665
VERMONT YANKEE Mru2 ' ;' " U ' ' " ' ' ' " " " ' '
Page 2 of 4 NATURE OF LER OR UUTAGE MALFUNCTION EQUIP:1ENT 11AINTENANCE NUlBER CAUSE RESU LT CORRECTIVE ACTION "B" Emergency Diesel Corrective NA Vibration Flexible Fuel Line Replaced Line Generator MR79-726 Leakage Piping Support, RIIR H-16 Corrective LER Improper Installa-Inadequate Support Added Additional Anchorage MR79-727 79-23/3L tion Torus Level Transmitter Ccrrective LER Transmitter Bumped Erratic Operation Tightened Fittings LT-16-19-38A/B MR79-729 79-24/3L llPCI Steam Line Support Corrective LER Piping Movement Anchor Belt Pull Out Redesigned and Repaired as MS-II-A10 MR79-750 79-15/3L Necessary See Note #2 Containment Air Monitor Corrective NA Dirt Seat Leakage Disassembled and Cleaned Isolation Valve V-76B MR79-751 Valve O
Shock Suppressors MS-15, Corrective LER Possibly Brittle
?luid Leakage, Rebuilt as Necessary RR-3, RR-13, RR-19, RR-34 MR79-758 79-26/3L "0"
Rings inubber RR-13 Con-
[
iidered Inoperable O
Shock Suppressors IIPCI Corrective NA Vibration
.cose Clamps and Tightened Same ao H-102-B, llPCI Il-103-A MR79-759 lolting "B" Emergency Diesel
- orrective NA Burned Wiring Loss of Status LightoReplaced Wiring Generator MR79-769 for Auto Regulator Water Level Transmitter Corrective NA Leaking Fitting Crratic Operation Replaced "0" Rings LT-6-52A MR79-772 Atmosphere Control Valve
'o r rec t ive LER
)ir t seat Leakage Disassembled and Cleaned V-16-20-20 MR79-773 79-28/3L Valve Forthcoming "B" Emergency Diesel
- orrective NA ihut Down Relay Out Inability to Shut Adjusted Relay Generator MR79-793
>f Adjustment down from Control Room 9
VERMONT YANKEE Par'A1 "W'"
' " " ' " ' ~ ~ '
Page 3 of 4 NATURE OF LER OR OUTAGE MALFUNCTION EQUIP:1ENT MAINTENANCE NU'1BER CAUSE ItESU LT CORRECTIVE ACTION "B" Emergency Diesel Corrective NA Faulty Relief Relief Lifts too Replaced Valve Generator Air Compressor MR79-787 Valve Low Motor Operator for Recirc Corrective NA Manual Breaker Breaker Could Not Adjusted Breaker Actuator Valve V-2-54-A-MR79-803 Actuator Out of be Closed Locally Adjustment Weld D8 on Main Steam Corrective NA Weld Porosity Failed NDE Mechanically Removed Indications o
Line "D" MR79-818 CO 9
Control Rod Drive llCU Corrective NA Normal Wear Leakage Replaced Valves as Necessary Cartridge Valves MR79-821 Control Rod Drive IICU Corrective NA Blown Fuses Solenoids Decner-Replaced Fuses 10-11 Scram Solenoids MR79-822 gized RCIC Turbine Covernor Corrective NA Dirt and Corrosion Seat Leakage Disassembled and Cleaned Valve MR79-844 RWCU Valve V12-63 Corrective NA Normal Wear Seat Leakage Lapped Valve Seat and Plug, Repacked Valve MR79-851 RWCU Valvc V12-68 Corrective LER Normal Wear Seat Leakage Lapped Valve Seat, MR79-851 79-28/3L Replaced Plug Forthcoming Standby Liquid Control Preventive NA Loose Valve Parts Possible Flow X-rayed Selected Pipe and System MR79-852 Blockage Valves to Locate Parts.
Removed the larger of the MR79-867 two Parts. Performed system Flow Capability Test.
Performed Loose Parts Analysis on Re-maining Part.
Control Rod Drive HCU Corrective NA Normal Wear Packing Leak Repacked Valve 1
38-11 MR79-854 g4
VERMONT YANKEE M"' ' ' 8 " ' " ' * " " *-"" ~ '
Page 4 of 4 NATURE OF LER OR OUTAGE MALFUNCTION EQUIP? TENT FIAINTENANCE NU:!BER CAUSE RESULT CORRECTIVE ACTION m
N
~
Recirc Valve V2-65-B Corrective NA Normal Wear Packing Leakage Repacked Valve MR79-858 CD CO Recirc Valve V2-65-B Corrective NA Normal Wear Bonnet Leakage Repaired by Welding g
MR79-868 Tie Breaker for DT-2 on Corrective NA Normal Wear Inoperable Replaced Breaker Bus 8B MR79-879 Control Rod Drive HCU's Corrective NA Normal Wear Erratic Operation Disassembled and Cleaned Valves 02-19 & 30-23 122 Valves MR79-882 Drywell/ Torus Vacuum Corrective NA Normal '. lear Valve Bonnet Leak-Replaced Gasket Breaker V16-19-5B MR79-884 age Drywell/ Torus Vacuum Corrective NA Microswitch Out of Erratic Position Realigned Switch Breaker V16-19-5B MR79-886 Alignment Indication Control Rod Drive HCU Corrective NA Normal Wear Seat Leakage Rebuilt Valve 38-35 Scram Inlet Valve MR79-897 Notes:
1.
Work Completed 9/7/79.
2.
Maintenance Request generated in response to I & E inspection it 2m 79-12-02.
Dates < 'n Maintenance Request forms reflect actual dates ge ierated, not dates completed. Work was completed 8/5/70.
e
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 791113 COMPLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 REPORT MONTH October, 1979 SU.'-DIARY OF OPERATING EXPERIENCES During the month of October, Vermont Yankee was undergoing refueling and maintenance operations.
I380 l21