/C Georgia Power CorrT;any Post Offee Box 4545 Atlanta. Gecrgia 30302 M

Telephone 404 522-0060 Vogtle Proj,ect Southem Company Sences, Inc.

mst one Box 2625 Birmingham, Alabama 35202 October 20-' 1979 Telephone 205 870-6011 United States Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement RII: JP0 Region II - Suite 3100 50-424 101 Marietta Street 50-425 Atlanta, GA 30303 File: X7BC24 Log: GM-517 Attno Mr. James P. O' Reilly Gentlemen:

The following is submitted in response to your 'etter dated July 2, 1979 concerning I.E. Bulletin 79-14.

No safety-related piping systens have been installed at Plant Vogtle.

The verification that seismic analyses are applicable to the as-built configuration of the plant cannot presently be accomplished. A nunber of project procedures exist which ensure that the as-built configuration will be reported to Engineering and that the seismic analyses will be performed using as-buil t information.

Future Quality Assurance audits will verify implementation of these procedures.

Very truly yours, CA N _

Dou]gDutonk kE Project General Manager CWH:db xc: U.S. Nuclear Regulatory Conmission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C. 20555 M. D. Hunt - USNRC, Region II j}z }gQ J. H. Miller, Jr. K. M. Gillespie W. E. Ehrensperger C. W. Hayes F. G. Mitchell, Jr. E. D. Groover C. F. Whitmer D. L. McCrary R. J. Kelly R. A. Thomas R. E. Conway J. L. l.carron '911160 ' R. W. Staf fa M. Z. Jeric J. T. Beckham, Jr. J. L. Yota 4 @ d '. s}}