Forwards 38 Documents to Support Review of Soil Deficiency Matters.Oversize Drawings Reduced in Size or Omitted. W/O Encl
ML19256E201
Person / Time
Site: Midland
Issue date: 10/16/1979
From: Hood D
Office of Nuclear Reactor Regulation
To: Lawhead W
ARMY, DEPT. OF, CORPS OF ENGINEERS
References
NUDOCS 7910300073
Download: ML19256E201 (3)


Text

TE A' A-

}(

UNITED STATES NUCLEAR REGULATORY COMMISSION 3

o g

j WASHINGTON, D. C. 20555

.....f OCT 1 6 1979 Docket Nos.:

50-329 and 50-330 Mr. William Lawhead U. S. Corps of Engineers NCEED-T 477 Michigan Avenue 7th Floor Detroit, Mich. 48226

Dear Mr. Lawhead:

SUBJECT:

TRANStilTTAL 0F RELATED DOCUMENTS FOR MIDLAND S0ILS DEFICIENCY The enclosed documents listed in attachment 1 are transmitted in support of your review of the soils deficiency matter occuring at the site for Midland Plant, Units 1 and 2.

Oversized drawings for this transmittal are either significantly reduced in size or omitted.

However, we under-stand copies oi full-sized drawings will be forwarded or made available by Sechtel, Ann Arbor, upon your request to Mr. Jerry Clements, (313)-

994-7669 or -7873.

Further documents on this matter will be forwarded as they become available.

Should you require additional documents or information, please do not hesitate to contact us.

Sincurely,

{

cp D. Hood, Project Manager Light Water Reactors Branch No. 4 Division of Project Management

Enclosure:

As stated cc:

J. Keppler (w/o encl.)

W. Omstead (w/o encl.)

H. Thornburg (w/o encl.)

L. Heller (w/o encl.)

1224 324 7 9103 00 C) 3 3 '

Attachment Document List 1.

G. Fiorelli letter of Oct. 1, 1979, I&E Inspection Report 50-329/79-19; 50-330/79-19 2.

D. Hayes letter to CPCO, June 20, 1979, Inspection Report 50-329/79-i0; 50-330/79-10 3.

S. Howell letter of June 25, 1979 forwarding Interim Report 6 on MCAR 24.

4.

G. Fiorelli letter of April 9, 1979, I&# Inspection Report 50-329/79-06; 50-330/79-06 5.

J. Keppler letter of March 15, 1979 forwarding " Presentation of Investigation Findings of the Settlement of the OG Bldg. and Plant Area Fill" and CPC0 discussion of same.

6.

Preliminary Notification dated March 7, 1979, " Settlement of the (Midland) Diesel Generator Building and Plant Area Fill".

7.

S. Howell letter of December 21, 1978 announcing selection of preload program for diesel generator building correction.

8.

J. Keppler letter to M. Cherry December 14, 1978 with enclotares of attachment 1 thereto, incluEling MCAR 24.

9.

R. Heishman letter dated November 17, 1978, I&E Inspection Report 50-329/78-12; 50-330/78-12.

10. W. Omstead letter to ASLB members, dated November 16, 1978.

11, J. Keppler letter to H. Thornburg dated November 1,1978 summarizing I&E Inspection Report 50-329/78-12; 50-330/78-12 and recommending NRR support.

12. S. dowell letter of April 30, 1979 forwarding interim report 5 for MCAR 24.
13. S. Howell letter of February 23, 1979 forwarding interim report 4 for MCAR 24.
14. S. Howell letter of January 5,1979 forwarding interim report 3 for MCAk 24.
15. M. Gibbs letter to ASLB members dated February 19, 1979 forwarding 50.55(e) reports, including S. Howell letter of November 7, 1978 with interim report 2 for MCAR 24.
16. S. Howell letter of September 29, 1978 forwarding interim report 1 for MCAR 24.
17. W. Omstead letter to ASLB board members dated De:. 7, 1978 with enclosures.

'8.

Bechtel Nonconformance Report No. 1482 dated 8/22/78.

13. J. Gilray memo dated August 27,1979, " Report of Meeting with Bechtel".
20. L. Rubenstein memo dated August 24, 1979, " Supplement to Technical Assistance Request of November 27, 1978".

1224 325

21. Memo from L. Rubenstein to J. Knight dated Sept. 27, 1979 requesting engineering priority.

22.

D. Hood memo to file, August 24, 1979, Internal Meeting on Status of Midland Soils Settlement.

23.

G. Gower memo to J. Keppler, Oct. 4, 1979, Enforcement Action Related to Midland DG Building and Plant Fill Areas.

24.

H. Thornburg memo to G. Gower dated Sept. 27, 1979, Comments on Needed Action on Midland Enforcement Package.

25.

H. Denton memo to S. Levine, March 23, 1979, User Request for Research Initiation - Earthquake Induced Foundation Settlement.

26. Trip Summary dated June 21, 1979 to inspect Midland test pits.

27.

Summary of March 6,1979 Trip to Observe Status of Soil Premad Program, dated March 20, 1979.

28.

Summary of December 4,1978 Meeting on Structural Settlements, dated January 12, 1979.

29.

D. Hood memo to file, dated Aug. 9, 1979, NRR Comments Regarding Enforcement Action on Midland Soil Deficiencies.

30.

H. Thornburg memo dated June 13, 1979, Comments on R III Enforcement Package on Midland Settlement Problems dated April 3,1979.

31.

J. Keppler memo dated April 3,1979, Enforcement Action Re: Midland Diesel Generator Building and Plant Fill Area, including I&E Inspection Report 329/78-20; 50-330/78-20.

32.

S. Howell letter of August 10, 1979 Documenting Presentations Made at a July 18, 1979 Meeting with NRC.

33.

L. Rubenstein letter to S. Howell dated Sept. 11, 1979 Requesting Additional QA Information.

34.

S. Howell letter of Sept. 13, 1979 Forwarding Revision 3 to 50.54(f)

Responses.

35.

D. Gillen memo dated Aug. 28, 1979, Midland 1 & 2 - Geotechnical Engineering Problems Related to Plant Fill.

36.

S. Howell letter of July 9,1979 Forwarding Revision 2 to 50.54(f)

Respnnses.

37.

S. Howell letter of May 31, 1979 Forwarding Revision 1 to 50.54(f)

Responses.

38.

S. Howell letter of April 24, 1979 Responding to 50.54(f) Requests Regarding Plant Fill.

'?*

Q.h la.