ML19256D729
| ML19256D729 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/26/1977 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Goller K Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19256D730 | List: |
| References | |
| NUDOCS 7910220652 | |
| Download: ML19256D729 (1) | |
Text
.
[
~
UNITED STATES NUCLEAR REGULATORY COMMISSION
[
j WASHINGTON,0. C. 20555 I
^[
',8 a
p
+....
A?R 2 o 13U MEMORANDU.1 FOR:
K. Goller, Assistant Director for Operating Reactors, DOR FROM:
D. Eisenhut, Assistant Director for Operational Technology, 00R
SUBJECT:
THREE-MILE ISLAND-1; REVIEW 0F TECHNICAL SPECIFICATIONS, AND SAFETY EVALUATION REPORT ON THE PROPOSED INTEGRATED SURVEILLANCE PROGRAM In accordance with your request, the Engineering Branch has evaluated the reactor vessel surveillance program submitt;d by the Metropolitan Edison Company for the Three-Mile Island-l plant on October 29, 1976.
We have concluded that their proposed integrated, augmented surveil-lance program is adequate. Our portion of the Safety Evaluation is attached.
\\
/
(b o_/
Mi
! [ M.
d D. Eisenhut, Assistant Director for Operational Technology Division of Operating Reactors
Contact:
W. Hazelton 28060
Enclosure:
As stated cc:
E. Case V. Stello L. Shao R. Reid G. Zwetzig i453 159 R. Snaider D. Davis J. Kn ight S. Pawlicki K. Hoge R. Randall W. Hazelton h
7910220
9-MM--a y,
b o
- s DISTRIBUTION:
Central Files Branch RF 26 W A?R 0
0 00@aS ME)ORANDUM FOR:
K. Go11er. Assistant Director for Operating Reactors. 00R
~
i p'
FROM:
D. Eisenhut Assistant Director for Operational Technology 00R
SUBJECT:
THREE-MILE ISLAND-1; REVIEW 0F TECHNICAL SPECIFICATIONS, AND SAFETY EVALUATION REPORT
' ~?
OR THE PROPOSED INTEGRATED SURVEILLANCE PROGRAM
~
.7 In accordance with your request the Engineering Branch has evaluated the reactor vessel surveillance program submitted by the Metropolitan
~_
Edison Company for the Three-Mile Island-1 plant on October 29. 1976.
'~ We have concluded that their proposed integrated, augmented surveil-c.. -
- f
.4 - %.tlance program is adequate. Our portion of the Safety Evaluation is
,i'--
-;n.s,.-n y gf.-
.-Q attached.
n
.. 'd,
j.
'w.
..s i., < ;,..
c w:-
g 1
c.,.
,,,, ~
V q.
/
~"
,j 3 D. Eisenhut. Assistant Director J
' -[
' *? for Operational Technology
^
y Division of Operating Reactors 4'
m-
Contact:
).
s.
~
W. Hazelton i
28060
~
Enclosure:
i As stated cc:
E. Case V. Stallo L. Shao R. Reid 1453 160'~
G. Zwetzig
~
" R. Snaider D. Davis J. Knight
- 5. Pawlicki-K. Hoge R. Randall W. Hazelton A f\\1
(
ome.>
EB 00ft.
i PNMN wha $elton ISh30 'k Dbahtit -
4/18/77 4
/77 4/h77 4/)1477 u
m....
_