UNITED STATES ATOMIC ENERGY COMMISSION O
r
\\'
DIVISION OF coMPLIANcc 201 645
'/*
RCGICN 1
%, b d 97o BROAD STREET yg p NEWARK, NEW JERSEY 07to2
- n 2w q *',7 6 vu?
J. P. O'Reilly, Chief, Reactor Inspection and Enforcement Branch, Division of Compliance, HQ METROPOLITAN EDISON COMPANY (THREE MILE ISLAND NO. 1)
DOCKET NO. 50-289 The attached report of the inspection of the Metropolitan Edison Company, Three bille Island No. 1 construction site, conducted August 26 through 28, 1970, is forwarded for information.
The inspection consisted of a detail review of portions of the QC system for reactor coolant piping welding, reactor coolant piping system procurement docu-ments and electrical cable and terminations.
One item of nonconformance was identified. The contractor engaged to perform all NITI of pipe welding at the site did not have NDT procedures which were qualified to the FSAR code comitments. A Construction Deficiency Notice is being prepared.
MD E. M. Howard Senior Reactor Inspector
Enclosure:
CO Rpt. No. 289/70-6, by D. M. Hunnicutt and J. H. Tilleu, dated 9/25/70 cc:
E. G. Case, DRS (3)
P. A. Morris, DRL R. S. Boyd, DRL (2)
R. C. DeYoung, DRL (2)
D. J. Skovholt, DRL (3)
P. W. Howe, DRL (2)
L. Kornblith, Jr., C0 Regional Directors, CO REG Filesty 29/
4910170 /27