ML19256D302
| ML19256D302 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/21/1969 |
| From: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7910170811 | |
| Download: ML19256D302 (1) | |
Text
.
gess' c,,#'t UNITED STATES g+
ATOMIC ENERGY COMMISSION
. Pg,
i WASH INGTON. D.C.
20545 May 21, 19c9 d'S r
Peter A. Morris, Director E1 vision of Reactor Licensing GECUTED TENDCIIS - SURVEILLAIICE CCUSIEEEATICIiS RPM (N) 2-2 The attached me=o frca EPB E2 points out the need for management consideratien of surveillance requirements for a containment structure with grouted tt. dons.
Three Mile Island Unit 2 is the first facility to utilize an all-grouted tendon scheme, although H.B. Robinson No. 2 has grouted vertical tendons.
Since this is a "new problem" I would like to schedule a meeting with you to discuss this catter before we take a firm "positien" with the applicant.
Ec er S. En-sista ' ~..a
'r e
f"
..eactor '- p ats fision of Reactor Licensing
Attachment:
As stated cc:
F. Schroeder S. Levine D. Skovholt E. EeYoung EP Eranch Chiefs (2)
RT 3rsnch Chiefs EO Eranch Chiefs
- 3. Grimes E. G. Case R. Engelken Decket Filei Q _,;
1450 301 791037g,p
.