Notifies That Met Ed Response to GAI-1729, Seismic Analysis of Equipment Mounted on Massive Structure, in Amend 15 & 17 Inadequate.Similar Approach to Seismic Monitoring of Beaver Valley Should Be Taken
ML19256D270
Person / Time
Site: Crane, Beaver Valley  Constellation icon.png
Issue date: 02/03/1971
From: Case E
US ATOMIC ENERGY COMMISSION (AEC)
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910170783
Download: ML19256D270 (2)


Text

.... _ _ _

.j g

M x

3g j

c Peter A. Morris, Director Director of Reactor Licensing THREE MILE ISLAND STATION - UNIT 1 DOCKET NO. 50-239 This concerns the inadequate response by the applicant contained in Amendments Nos.15 and 17 to the following question which was listed in my memo of July 29, 1970.

"The comparison for a single degree-of-freedom modal method identified in " Seismic Analysis of Equipment Mounted on a Massive Structure," J. H. Biggs and m

J. M. Roesset and referenced in GAI Report No.1729 may not be conservative for multi-mass systems (Three Mile Island).

Provide the basis for and the conservatism in the use of this method by demonstrating equivalency to a multi-mass time history method (applicable to the Three Mile Island Site).

Alternatively, other theoretical methods or experimental analyses and tests may be submitted in justification."

The applicant should be requested to provide an adequate and timely response to the above question.

To expedite

.=

resolution of this matter we suggest that the applicant be informed that an acceptable response may be either the approach specified in the Beaver Valley Plant response to a similar question, (Refer to " Safety Evaluation by Division of Reactor Licensing in the matter of Duquesne Light Company, Pennsylvania Power Company and 01:1o Edison Company, Beaver Valley Power Station Docket No. 50-334" dated April 24,1970) or a

\\450 \\48h,,

OFFICE >

SURNAME >

DATE >

Form AEC-518 e Rev. 9-53) AECM 0240 e.s. eossameser moves emes : sees o-se _eir 7910170 M.3 g

Peter A. Morris 2-FEB 3 E7f seismic design procedure similar to that applied to Robinson Plant.

Since this problem may be a long lead item which may affect tne completion date of our review, we suggest that the applicant also be notified of the importance of resolving this problem promptly.

Orf.rfnal signed lif L G. Case

/

J'

~,,5, Edson G. Case, Director

.) 44 Division of Reactor Standards cc:

R. DeYoung. DRL R. Boyd, DRL D. Skovholt DRL R. R. Maccary, DRS C. Long, DRL A. Dromerick, DRS D. Ross, DRL J. Knight. DRS X. Wichman, DRS D. Lange. DRS S. Hanauer, DR 1450 149 e

DRS:MEB omer >

,, DRS : AD/ E D? {'DIR DLa h ; amp RRMaccary EGQ&sh sumuc >..P v

E I.*....U.1..........?l.3..L11 2J.3../.w....

om >

Form AEC-51e tRev. 9-53) AECM 0240 e s. sovnsesse ens omca : ee o-a ir