Discusses Concentration of Solids in Vessel Following cold-leg Breaks.Requests Scoping Calculation of Extent to Which Saturation Is Reached at End of 24 Hours
ML19256D261
Person / Time
Site: Crane 
Issue date: 03/04/1971
From: Ross D
US ATOMIC ENERGY COMMISSION (AEC)
To: Burley G
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910170773
Download: ML19256D261 (1)


Text

_

\\

March 4, 1971 Distribution:

PWR-2 Reading Cordon Burley

,; Docket File (50-289)

CONCEhTRATION OF SOLIDS IN TMI-1 VESSEL FOLLOWING COLD-LEG BREAK For certain cold-leg breaka for TMI-1, heat removal will probably be by evaporation alona. The potential for buildup of solida exists.

Please calculate that potential for the following conditions:

1.

Vessel caracity-2500 ft3 liquid, or 18,750 gal.

2.

Liquid 'ieuperature 200*F

~-

3.

Initial Baron concentration 1000 ppa.

4..

Boiloff Rates

~.

a.

0-30 mia.:

" 300 gym b.

30 mia.-24 hr.: 150 spa 5.

Incoming Water a.

0 - 30 mia.:

1 lb H 303 per 8 gal water 3

11h NaOH per 12 gal water b.

30 min.-24 hr.:

12h H 503 per 14 gal water 3

1 lb NaOH per 22 gal water 1 lb Ma2 2 3 per 12 gal water 80 The fund==atal question to be resolved in whether the dissolved solids will remeia dissolved. Certainly there will be a time that saturation will be reached if boiloff is continuous. We are discussing the thermal aspects with E4:W currently.

-As a scoping calculat: 9, datarmine the extent to which saturation is reached at the end of 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br />.

cc:

C. G. Long Douvood F. Ross M. A. Taylor FUR Project Branch No. 2 T. 1. Wilace Division of Emactor Licensing D. Ross

,.I o

DRL:PWR-2 l

e,

$URNAleE >

Ro s:eag 34,

,o 3/4/71 k

care >

Form AEC-SIS tllev.9-53) AECM 0240 at aavenemeur eseen.s ore.ca seee e-sen

$ 91017 0 773