Informal Summary of 671214 Meeting W/Util Re CP Review.Lists Observations.Formal Summary Will Be Prepared by Reactor Project Branch 3
ML19256D254
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/18/1967
From: Birkel R
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910170766
Download: ML19256D254 (1)


Text

F-File Daceber 13, 1?!?

Ralph A. h Wel Cperati:nal Safety 2 ranch, E a v', N_C "= ". 1,", 'C "..

..__.v,.m.,.--.. m..e. v._ a.

7.s;..^~. i C.o..".,7

.w

... u a..

~

D:CET :IO. 50-220 3

The foll: wing Fomal meeting ninutes will be prepared by ".P3 are caservations pertinent to the C33 r: view, a) The revised engineering crganization chart (fig.1-13) was discussed in detail with Mr. R. L. : eidig, 'l.

P.

Eng.,.let. Ed.

Aspects included relaticnships, functions, authority, resconsibility, as well as review and audit structure. It was agreed that certain changes in the organization chart would be decirable pursuant to cur su;;gestiens.

These changes would be inecrporated in a revised chart to ce suteitted by Mst. Ed. cn er abcut Eec. 22. It was peinted out by Mr. !!eidig that Met. Ed. will have during ccpcnent fabrication, construction and installation and post-censtruction stages ultimate and final responsibility and thus will have courplete control of the project. The "stop and msure" respcnsibility rests with Met. Ed.

b) Met. Ed. states that their present e=ergency nlan is merely an outline which they will build upen. It is evident that considerable effort and consideraticn was exnsnded in it:

develo,: cent.

The ultimate responsibility for implementation of the e=2r;; ncy plan rests with the Radiation Protection Jupervisor. Iha present incumbent (Richard Deakin) is a non.;;raduate with a health physics background (2-3 years at Temple University-physics and has served en the ori;;inal crew Of.i. 5. c van-shl Met. Ed. feels strcngly that this position description shr:1 remain flexible, 1. e. no requir-ment f0r college ;-aduate.

The R?3 alternate will probably b2 the Zhlft ?:r an.

PCOR ORMAI.

m l

l CF7 ICE >

i i

$URNAMEp

_,i f

i t

DATE >

l..

Ebrm AEC.314 ; R.v. 9-M:

gm,,,,,,,,,

e File Dece=ber 13, 1967 Fcr a'raeustien purposes, a =otor launch is availat'_c.-

innedisce use in the event that the bridge be:oces unuseable.

- n'"I stana that non-essential persennel can be evacuated via t..e a,_ ternate route in cen:siderable less than 30 ninutes.

Present :iet. Ed. planning includes the formation and use cf t;;c s=er;ency tenitcrir.g tea.-

cceprised of 2 men each.

relecucn of team cubers is not final, cet D. J. Skcvholt, CRL

}Pj($(kb 1450 120 l

i OFFICE >

...,. 4 /

L....

l

....l.

..L l

sumuc >..lU..iir$eM.. '

_>i -

..w %..

..........i............... ;

Forni AEC.318 i Rev. S-M1 u 5 Gevt1t==tstrg'%Tinswru. me-o-:ia4 s