ML19256D132

From kanterella
Jump to navigation Jump to search
Approves Applicant Repair Program for Concrete Voids in Tendon Access Gallery Per Nc Moseley .Epoxy Should Have Comparable Life Span to Structure & New Grout Should Be Adequately Tied Back to Main Concrete
ML19256D132
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/20/1969
From: Dromerick A
US ATOMIC ENERGY COMMISSION (AEC)
To: Engelken R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910170609
Download: ML19256D132 (1)


Text

P00R ORGINAL R. H. En ;elken, Assistant Director for Inspection and Enforcerent, C0 THRU:

S. Levine, Assistant Director for Reactor Technology, EE METROPOLITAN EDISON - THREE MILC ISLAND #1, DOCKET #50-289 -

REPAIR OF CONCRETE VOIDS IN TENDON ACCESS GALLERY We have reviewed the applicant's repair program for the cencreta voids in the tendon access gallery as presented in Mr. N. C. Moseley's letter of February 5, 1969. Two items which we feel the repair should keep in mind are:

(1) Ihe epoxy used should have a durability equal to the structure's life span.

(2) The new grout / concrete should he adequately tied back to the main concrete.

As va foresee no difficulties in obtaining the desired results for (1) and (2) under the program proposed, we have no objections to the applicant proceeding with the repairs as presented.

A. W. Droicerick, Chief RT-171A Containnent & Component Technology 3 ranch DRL:C&CTB:ECA Division of Reactor Licensing cc:

J. P. O'Reilly, CO D. Ross, DEL A. L. Gluckmann, DRL R. S. Boyd, 'GRL Dis tribution:

Suppl bec:

S. Levine DRL Reading i446 225 C&CTB Reading r

r ek ADRT Reading G. A de

,g 91017 0 b

.DRL C&CT3 l DRL:yADKTf DREsjaDRI,

l omer>

DI%:.g&GT1.....I I

7 l

i

/

SURNAME > [CAtud!!eue.... '.Mgogg g4ck__ RdaYoung....r..fd,gving,,

i om > l. 2'..~

. 69 l2- /-69

!2.-..69.......

! ? O-69 I

i Form AEC.Sts iRev 9-53) AECM 0240 a.s. savan. uter==>we'.a sema

...o

.