ML19256D070

From kanterella
Jump to navigation Jump to search
Summary of 750930 Meeting W/Met Ed to Discuss Util Participation in Trial Insp Program Employing Statistical Sampling Technique
ML19256D070
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/09/1975
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML19256D071 List:
References
NUDOCS 7910160791
Download: ML19256D070 (1)


Text

-

e P00R RRIGWI W. J. Dircks, Assistant Executive Director for Operatioco

-~l, EETEOPOLITAU EDISON P.CTICI?ATIO;' IN T"lu. I:is?ECTID3 P20GEXi EITLCYING THE STATISTIC SMTLING INSPECTION TECEUIq"E On Septerier 30,1975, J. 3. Snic ek, Chief, Li;;ht Water Ecactor Programs Branch, and A. B. Davis, Senior Reactor Inspector, Office of Inapection and Enforcement, cet with R. C. Arnold. Vice President.

Metropolitan Edison Co apany, to discuss the trial inspection program being conducted by I" at Three Mile Island l' nit 1.

The discussion esotered about Metropolitan Edison's concern that the results of the inspection program could be used by non-NRC personnel in a r.anner that could reflect unfairly en the performanca of Metropolitan Edison as related to compliance with NRC requiremnts.

Mr. Arnold was infor=ed of the purposa and scope of the trial prograr and how it differs from the routine inspection program.

It was c=pha-sized that any resultant enforcement action would be completely con-sistant with existing criteria. The possible nethodology for tabu-lating the nunber of fastances of noncompliance versus the number of chances for noncompit.ance was discussed. Metropolitan Nison was infor1aad that this satter was being pursued by IE as one aspect of tha trial program.

Mr. Arnold was of the view that the NRC should probably r.ake a state-n:ent regarding Eatropolitan Edison's perforracce at the conclusion of the trial progr*m to preclude personnel outside the !.T.C from utilizing the results of the trial program in an irresponaible canner.

Mr.

Arnold was infomed that this decision would be nade af ter the results of the trial program had been evnlusted as to the feasibility of such a statement.

As a result of tha eeting, it appears as thouch Metronolitan E11 son's cencerns have been alleviated, but not eliminated. We believe that Metropolitan Edison vill cooperate eith the NRC during the conduct of this trial program.

IS!

John G. Davis, Deputy Director

, 7; -

Office of Inspection and Enforcement 4.s jd46 096 cc:

D. F. Knuth, IE

\\

Distribution:

5. H. Grier, IE IE Files RIP Reading II:LURB (S T

_t p nimit, T

.y Central Files EE:LWRB (JS)

J. G. Davis, IE IE: LWR 3 IE: RIP IE:DD

.y91016 4/

' " ~ " '

  • JESniezek:mj BEGPier-JG0 avis b

10/9/75

-10/-~/75 M/ - / 7 'i T

f uus MC-311 s Re. 9 93) AECM 0243

  1. u. s. oova.wu smr samtma o nics: to74.sas 9 ee