ML19256D030
| ML19256D030 | |
| Person / Time | |
|---|---|
| Site: | Crane, Hatch |
| Issue date: | 12/10/1974 |
| From: | Lear G US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Skovholt D US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7910160760 | |
| Download: ML19256D030 (2) | |
Text
.
P00R ORGINA 07a 3_
Ocnal.
4.c.v t.el t, Assistant rirect.or fcr cuality Mssur,r.ce Orerat t
irector for Operatin 2cactoregYf.ig',5
~2! '. :
.r1 T. Geller, Assistant STr?A2D T CPJICAL SPECIFICATIOMS (STC) TC?
TIT.- "I'._T ISIC-1 (T':1-1)
A:I U.TC~-1 On Decenber 2, 1974 I called the licensces for 71-1 and :iatch-1 te enquire into their interest ir participating in revisirp current Technical Specifications for their operating reactors. The revision would be to incerporate a new Standard Technical Specificatien fer each facility.
Mr.
- 1. C. Arnold, Vice President fer Gc cration at Metropolitan Edisen (MctEd), has inforned ne that Met d has int. crest in participatin;, in adaptina and/cr devoleping the El STS for ap,licatica on T'II-1.
In this regard, he vants to ncet to discuss the scope of the verk involved, scheduling, and related natters. A necting at 1C:CO a.n. in F-126 on Wednesday, Dece:.ber 11, 1974 has been scheduled to catablish connon understanding of this proj ect.
Mr. Sill Ernsburger, Tice President for 2ngincering at Georgia Power Ccupany, also advised ne of his interest in undertaking a revision of the Technical Specificatiens. ::e asked that we send three copies of the GE-STS for their initial review prior to discussion cf natters such as scope of work, ruanpower connitnents, scheduling, and other related itens.
In view of the favorable response to ny enquiries, it is requested that you previde us the follevin--
Supply of five conplete ccpies of each STS fer En and GI plsnts n.
for use in discussiens with the licensees.
b.
Identificat' ion of the individuals within ycur organisation who vill be associated with the review and preparation of STS for Eatch-1 and ~'!I-1.
The project managers (Pifs) in 0:1L#'l assigncd to the T'il-1 and hatch-1 reactors arc 1 r. D. Jaffe ord Dr. D. Brid:;es. These P?:s should be the 1446 006 7910160 (D
4 L.m c.1. J. " c :.elt DEC 1 0 1974 priuarf contact point: for all licensee comunications and other arprcpriate ?i; functivnc during the courac of the CTS ver!' with
'.'et'_d and Coorgia Fever Cor.pany.
Original Signed George Lear, Chief Operating Reactors Branch 13 Directorate of Licensing cc:
R. S. Tcyd R. Voll=cr l
DISTRIBUTION:
Docket ORB #3 Rdg KRGoller TJCarter Glear DJatte IBrid 2s 2
JMcGough JMcMullen SATeets R0 (3)
TAA6 007 ORB #3 L:AD/0Rs o,,,,,,
kh GLear:kmf61.-
KRGoller 3
12/ [ /74 12/ 9 /74 Form AEC-319 (Rev. 9 53) AEcM 0240 W u. s. uovsanusst== intime arries: e en.sae. css