PNO-79-155:on 790612,local Television Station Requested on Interview W/Qa Organization in Order to Probe Into Alleged Coverup of Noncomforming Concrete Repairs on Containment & Steam Tunnel Structures.Further Investigation Planned
ML19256C995
Person / Time
Site: Marble Hill
Issue date: 06/14/1979
From: Henderson J, Reinmuth G, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-79-155, NUDOCS 7910150830
Download: ML19256C995 (1)


Text

.

PRELIMINARY NOTIFICATION June 14, 1979 PRELIMINARY NOTIFICATION OF. EVENT OR UNUSUAL OCCURRENCE--PNO-79-155

[

This preliminary notification constitutes EARLY notice of event of

[

POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

Dcility:

Public Service of Indiana, Marble Hill Units 1 and 2 (DN 50-546 and DN 50-547) Plainfield, Indiana subject:

ALLEGED COVER-UP OF NONCONFORMING CONCRETE CONSOLIDATION REPAIR DEFICIENCIES On June 12, 1979, RIII was informed by the licensee's QA Manager of the following allegations and related events:

1.

On the morning of June 12, 1979, a local TV station (Channel 2, WAVE, Louisville, Kentucky) requested "on-camera" interview with the licensee's QA organization and the site concrete contractor's QA organization.

2.

During this plant site interview, the licensee was informed that a 24 page legal deposition had been filed with the Jefferson County Court House by a local intervening group (Save the Valley) in behalf of a site concrete craftsman.

This deposition is believed, but not known to be, the basis of a suit.

This deposition reportedly describes collusion between the licensee's QA organization and the site concrete contractor's QA organization for the purpose of either " covering up" or misrepresenting nonconforming concrete repairs on the containment and steam tunnel structures.

3.

One page of this document was given to the licensee during the site interview.

The licensee is attempting to obtain a full copy.

Further inquiry and investigation by RIII is planned.

The licensee has made a press release.

The state of Indiana will be notified.

This PN is being issued because of anticipated widespread publicity.

Region III (Chicago) received notification of this matter at 3:15 p.m. on June 7, 1979.

Contact:

JBHenderson, IE x27551 GWReinmuth, IE x27551 HDThornburg, IE x28484 Distribution:

Transmitted H St 8 s[>

Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky ACRS (For Distribution)

Transmitted: MNBB CG P. Bldg 9 lOCi V. Stello, IE L. V. Gossick, EDO H. R. Denton, NRR Region M 3.'.2J H. L. Ornstein, EDO R. C. DeYoung NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Haller, MPA R. S. Boyd, NRR (MAIL)

R. G. Ryan, OSP SS Bldg g.'llU J. J. Cummings, OIA H. K. Shapar, ELD W. J. Dircks, NMSS R. Minogue, SD _

}kN

.Og I/

S. Levine, RES PRELIMINARY NOTIFICATION g

.