PNO-79-293:on 790727,failed Tube in Main Condenser Allowed in-leakage of Sea Water Which Resulted in Sodium Concentration Increase.Unit Shut Down,Failed Tube Plugged & Steam Generators Drained.Will Return to Svc 790802
ML19256C896
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 07/31/1979
From: Bryan S, Klingler G, Nolan F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-79-293, NUDOCS 7910150712
Download: ML19256C896 (1)


Text

l.rt u \\ t s h o

July 31, 1979

~

PRELIMINARY NOTIFICATION OF EVENf OR UNUSUAL OCCURRENCE--PNO-79-293 This oreliminary notificaticn constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The information presented is as initially received without. verification or evaluation and is basically all that is known by IE staff on this date.

Facility: Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant, Unit 2 Lusby, Maryland (Docket No. 50-318)

Subject:

CELORIDE INTRUSION OF SECONDARY WATER SYSTEM At 10:00 p.m. on July 27,1979, Unit 2 was shut down for planned repair of a steam leak on the feedwater check valve inside containment.

After repairs were effected a ret. urn to service commenced on the 4-12 p.m. shift on July 28.

During startup preporations, the strip recorder chart for sodium (Na) concentration indicated a stead 7 increase to approximately 60 PPM (indicative of increasing chloride (Cl) concentration in the secondary water).

A failed tube in the main condenser which resulted in sea water in-leakage was discovered as the cause of the increase of the sodium concentration.

The plant was placed in cold shutdown.

The failed tube was plugged, the steam generat. ors were drait.ed and the remainder of the secondary system is currently being bled and fed to re 'uce the chloride concentration to acceptable limits for return to service, tente.ively scheduled for August 2.

This PN is issued for information only.

Followup will be performed during routine inspection program.

Media interest is not expected.

The State of Maryland has been informed.

A press release is not planned by the licensee or NRC.

This information was communicated to the IE HQ Duty Officer on July 30, 1979 during routine emergency telephone checks.

NRC, Region I, (Philadelphia) received notification of this occurrence by Lele-phone from the licensee at 9:00 a.m. on July 30, 1979.

Contact:

G. Klingler, IE x28019; F. Nolan, IE x28019; S. Bryan, IE x28019 Distribution:

Transmitted H St Cnairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Nennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky ACRS y

(For Distribution)

Transmitted: MNEB P. Bld g Ci ". h:>

V. Stello, IE L. V. Gossick, EDO H. R. Denton, NRR Region T _

H. L. Ornstein, EDO R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Haller, MPA D. Vassallo, NRR (MAIL)

R. G. Ryan, OSP D. Eisenhut, NRR J. J. Cummings, OIA H. N. Shapar, ELD SS Bldg R. Minogue, SD W. J. Dircks, NMSS S. Levine, RES PRELIMINARY NOTIFICATION

\\k4I g9101507 G f

--